IAC logo
IAC Assessment: BD0258
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0258
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2004
Principal Product PVC Plastic Dip & Injection Molded Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 85
Plant Area (Sq.Ft.) 85,000
Annual Production 400,000,000 Pieces
Production Hrs. Annual 5,000
Location (State) Mo
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,977 1,471,050 kWh $0.06
Electricity Demand $9,386 4,392 kW-months/year $2.14
Natural Gas $49,008 6,928 MMBtu $7.07
TOTAL ENERGY COSTS $164,220
RECOMMENDED SAVINGS* $7,540 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,293
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,506
Cost:
$2,025
$2,048 41,117 $458 214 - - - - - - $2,048
41,117
kWh
$458
214
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$953
Cost:
$2,175
$1,082 21,779 $37 17 $(-166) - - - - - $1,082
21,779
kWh
$37
17
kW-months/year
$(-166)
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$952
Cost:
$1,280
$928 18,645 $24 11 - - - - - - $928
18,645
kWh
$24
11
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$611
Cost:
$600
$544 10,924 $67 31 - - - - - - $544
10,924
kWh
$67
31
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$575
Cost:
$24
$440 7,570 $36 16 $6 - - - $93 - $440
7,570
kWh
$36
16
kW-months/year
$6
-
$
-
-
$
$93
-
$
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$271
Cost:
$335
$166 3,329 $10 5 $15 - - - $80 - $166
3,329
kWh
$10
5
kW-months/year
$15
-
$
-
-
$
$80
-
$
07: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$1,672
Cost:
$180
- - - - - - $1,672 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,672
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$7,540
Cost:
$6,619
$5,208 103,364 $632 295 $(-145) - $1,672 - $173 - $5,208
103,364
kWh
$632
295
kW-months/year
$(-145)
-
$
$1,672
-
$
$173
-
$
TOTAL IMPLEMENTED Savings:
$5,293
Cost:
$6,415
$4,768 95,794 $596 279 $(-151) - - - $80 - $4,768
95,794
kWh
$596
279
kW-months/year
$(-151)
-
$
-
-
$
$80
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost