IAC logo
IAC Assessment: BD0259
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0259
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2004
Principal Product Margarine
NAICS 311512 - Creamery Butter Manufacturing
SIC 2021 - Creamery Butter
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 40,000
Annual Production 153,764,535 Pounds
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $546,213 9,338,246 kWh $0.06
Electricity Demand $94,633 23,165 kW-months/year $4.09
Natural Gas $190,663 32,393 MMBtu $5.89
TOTAL ENERGY COSTS $856,439
RECOMMENDED SAVINGS* $90,792 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $84,292
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$31,009
Cost:
-
$27,334 467,251 $3,675 899 - - - - - - - - $27,334
467,251
kWh
$3,675
899
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,519
Cost:
$12,700
$10,460 178,956 $1,059 261 - - - - - - - - $10,460
178,956
kWh
$1,059
261
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,350
Cost:
$6,635
$4,650 79,497 $700 171 - - - - - - - - $4,650
79,497
kWh
$700
171
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$5,339
Cost:
$2,000
$(-243) (-4,160) $(-25) (-6) $5,607 953 - - - - - - $(-243)
(-4,160)
kWh
$(-25)
(-6)
kW-months/year
$5,607
953
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,522
Cost:
$2,700
$3,631 62,076 $891 219 - - - - - - - - $3,631
62,076
kWh
$891
219
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,493
Cost:
$1,500
$3,911 66,858 $582 142 - - - - - - - - $3,911
66,858
kWh
$582
142
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,373
Cost:
$9,540
$4,254 72,758 $572 140 - - $49 - $(-502) - - - $4,254
72,758
kWh
$572
140
kW-months/year
-
-
MMBtu
$49
-
$
$(-502)
-
$
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,141
Cost:
-
$3,605 61,628 $536 131 - - - - - - - - $3,605
61,628
kWh
$536
131
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,968
Cost:
$400
$1,796 30,688 $172 42 - - - - - - - - $1,796
30,688
kWh
$172
42
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
10: 2.1222 INSTALL TURBULATORS Savings:
$1,916
Cost:
$1,200
- - - - $1,916 326 - - - - - - -
-
kWh
-
-
kW-months/year
$1,916
326
MMBtu
-
-
$
-
-
$
-
-
$
11: 2.7134 USE PHOTOCELL CONTROLS Savings:
$228
Cost:
$300
$160 2,741 $38 10 - - $15 - $15 - - - $160
2,741
kWh
$38
10
kW-months/year
-
-
MMBtu
$15
-
$
$15
-
$
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$211
Cost:
$150
$117 1,997 $11 3 - - $35 - $48 - - - $117
1,997
kWh
$11
3
kW-months/year
-
-
MMBtu
$35
-
$
$48
-
$
-
-
$
13: 4.6420 INSTALL SENSORS TO DETECT AND AVOID JAMS Savings:
$15,723
Cost:
$3,000
- - - - - - - - - - $15,723 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$15,723
-
$
TOTAL RECOMMENDED Savings:
$90,792
Cost:
$40,125
$59,675 1,020,290 $8,211 2,012 $7,523 1,279 $99 - $(-439) - $15,723 - $59,675
1,020,290
kWh
$8,211
2,012
kW-months/year
$7,523
1,279
MMBtu
$99
-
$
$(-439)
-
$
$15,723
-
$
TOTAL IMPLEMENTED Savings:
$84,292
Cost:
$29,235
$55,304 945,535 $7,628 1,869 $5,607 953 $15 - $15 - $15,723 - $55,304
945,535
kWh
$7,628
1,869
kW-months/year
$5,607
953
MMBtu
$15
-
$
$15
-
$
$15,723
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost