IAC Assessment: BD0267
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0267
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2004
Principal Product Signs and Sign Cases
NAICS 339950 - Sign Manufacturing
SIC 3993 - Signs And Advertising Specialities
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 121,000
Annual Production 300 Pieces
Production Hrs. Annual 2,080
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,468 1,194,960 kWh $0.04
Electricity Demand $39,353 3,206 kW-months/year $12.27
Natural Gas $68,928 9,035 MMBtu $7.63
TOTAL ENERGY COSTS $164,235
RECOMMENDED SAVINGS* $49,409 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,582
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$14,742
Cost:
$10,000
- - - - $1,742 231 $13,000 - - - -
-
kWh
-
-
kW-months/year
$1,742
231
MMBtu
$13,000
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,548
Cost:
$320
$1,463 40,186 $2,845 232 - - $87 - $153 - $1,463
40,186
kWh
$2,845
232
kW-months/year
-
-
MMBtu
$87
-
$
$153
-
$
03: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$3,575
Cost:
$3,000
- - - - $3,575 474 - - - - -
-
kWh
-
-
kW-months/year
$3,575
474
MMBtu
-
-
$
-
-
$
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$2,983
Cost:
$4,250
- - - - $2,983 395 - - - - -
-
kWh
-
-
kW-months/year
$2,983
395
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$818
Cost:
$60
$278 7,636 $540 44 - - - - - - $278
7,636
kWh
$540
44
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$749
Cost:
$720
$172 4,736 $577 47 - - - - - - $172
4,736
kWh
$577
47
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$364
Cost:
-
$124 3,394 $240 20 - - - - - - $124
3,394
kWh
$240
20
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$234
Cost:
$210
$97 2,663 $45 4 - - $58 - $34 - $97
2,663
kWh
$45
4
kW-months/year
-
-
MMBtu
$58
-
$
$34
-
$
09: 2.7134 USE PHOTOCELL CONTROLS Savings:
$229
Cost:
$250
$44 1,207 $180 15 - - $1 - $4 - $44
1,207
kWh
$180
15
kW-months/year
-
-
MMBtu
$1
-
$
$4
-
$
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$173
Cost:
$292
$39 1,084 $134 11 - - - - - - $39
1,084
kWh
$134
11
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$124
Cost:
$30
$42 1,164 $82 7 - - - - - - $42
1,164
kWh
$82
7
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
12: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$11,120
Cost:
$5,174
- - - - - - - - $11,120 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$11,120
-
$
13: 4.447 AUTOMATE PAYROLL SYSTEM Savings:
$9,750
Cost:
$2,500
- - - - - - $9,750 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,750
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$49,409
Cost:
$26,806
$2,259 62,070 $4,643 379 $8,300 1,100 $22,896 - $11,311 - $2,259
62,070
kWh
$4,643
379
kW-months/year
$8,300
1,100
MMBtu
$22,896
-
$
$11,311
-
$
TOTAL IMPLEMENTED Savings:
$13,582
Cost:
$6,486
$752 20,677 $1,618 132 - - $58 - $11,154 - $752
20,677
kWh
$1,618
132
kW-months/year
-
-
MMBtu
$58
-
$
$11,154
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material