Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2007
Principal Product Water Based Colorants
NAICS 325510 - Paint and Coating Manufacturing
SIC 2851 - Paints And Allied Products
Sales $10,000,000-$50,000,000
# of Employees 96
Plant Area (Sq.Ft.) 350,000
Annual Production 35,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $300,437 4,073,254 kWh $0.07
Natural Gas $153,993 18,041 MMBtu $8.54
TOTAL ENERGY COSTS $454,430
RECOMMENDED SAVINGS* $133,096 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,450
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$43,434
Cost:
$19,814
$43,433 2,007 $1 1,216 - - - - - - $43,433
2,007
kWh
$1
1,216
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,359
Cost:
$2,026
$4,358 1,909 $1 122 - - - - - - $4,358
1,909
kWh
$1
122
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$524
Cost:
$65
$523 24 $1 12 - - - - - - $523
24
kWh
$1
12
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$11,450
Cost:
$4,951
$11,447 529 $1 556 - - $1 - $1 - $11,447
529
kWh
$1
556
kW-months/year
-
-
MMBtu
$1
-
$
$1
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,820
Cost:
$301
$1,819 84 $1 50 - - - - - - $1,819
84
kWh
$1
50
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$321
Cost:
$2
$16 1 $1 6 $304 148 - - - - $16
1
kWh
$1
6
kW-months/year
$304
148
MMBtu
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$841
Cost:
$2
$840 39 $1 23 - - - - - - $840
39
kWh
$1
23
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,672
Cost:
$7,701
$2,671 124 $1 215 - - - - - - $2,671
124
kWh
$1
215
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,486
Cost:
$26,401
$4,485 207 $1 883 - - - - - - $4,485
207
kWh
$1
883
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: Savings:
$9,311
Cost:
$301
$9,310 169 $1 261 - - - - - - $9,310
169
kWh
$1
261
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$53,878
Cost:
$20,001
- - - - $53,878 6,397 - - - - -
-
kWh
-
-
kW-months/year
$53,878
6,397
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$133,096
Cost:
$81,565
$78,902 5,093 $10 3,344 $54,182 6,545 $1 - $1 - $78,902
5,093
kWh
$10
3,344
kW-months/year
$54,182
6,545
MMBtu
$1
-
$
$1
-
$
TOTAL IMPLEMENTED Savings:
$11,450
Cost:
$4,951
$11,447 529 $1 556 - - $1 - $1 - $11,447
529
kWh
$1
556
kW-months/year
-
-
MMBtu
$1
-
$
$1
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material