IAC Assessment: BD0333
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0333
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2007
Principal Product Painted Steel, Steel Tubing
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3317 - Steel Pipe And Tubes
Sales $10,000,000-$50,000,000
# of Employees 89
Plant Area (Sq.Ft.) 200,000
Annual Production 72,000 Tons
Production Hrs. Annual 4,160
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $294,841 5,080,320 kWh $0.06
Electricity Demand $83,683 37,695 kW-months/year $2.22
Natural Gas $387,740 42,081 MMBtu $9.21
TOTAL ENERGY COSTS $766,264
RECOMMENDED SAVINGS* $247,656 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,143
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,570
Cost:
$901
$1,296 75 $274 130 - - - - - - $1,296
75
kWh
$274
130
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$376
Cost:
$476
$332 5 $16 8 - - $12 - $16 - $332
5
kWh
$16
8
kW-months/year
-
-
MMBtu
$12
-
$
$16
-
$
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$36,206
Cost:
$15,001
- - - - $36,206 3,931 - - - - -
-
kWh
-
-
kW-months/year
$36,206
3,931
MMBtu
-
-
$
-
-
$
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$73,372
Cost:
$30,001
$975 15,522 $106 51 $72,291 7,846 - - - - $975
15,522
kWh
$106
51
kW-months/year
$72,291
7,846
MMBtu
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$67,989
Cost:
$35,001
- - - - $67,989 6,395 - - - - -
-
kWh
-
-
kW-months/year
$67,989
6,395
MMBtu
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$819
Cost:
$526
$679 39 $140 67 - - - - - - $679
39
kWh
$140
67
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$378
Cost:
$2
$313 18 $65 31 - - - - - - $313
18
kWh
$65
31
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$66,946
Cost:
$2
- - $66,946 30,156 - - - - - - -
-
kWh
$66,946
30,156
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$247,656
Cost:
$81,910
$3,595 15,659 $67,547 30,443 $176,486 18,172 $12 - $16 - $3,595
15,659
kWh
$67,547
30,443
kW-months/year
$176,486
18,172
MMBtu
$12
-
$
$16
-
$
TOTAL IMPLEMENTED Savings:
$3,143
Cost:
$1,905
$2,620 137 $495 236 - - $12 - $16 - $2,620
137
kWh
$495
236
kW-months/year
-
-
MMBtu
$12
-
$
$16
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material