IAC logo
IAC Assessment: BD0347
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0347
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2008
Principal Product custom-machined metals
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 260
Plant Area (Sq.Ft.) 230,000
Annual Production 1 Units
Production Hrs. Annual 6,264
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $411,063 8,378,234 kWh $0.05
Electricity Demand $63,372 6,967 kW-months/year $9.10
Electricity Fees $78,808 - $ -
Natural Gas $31,784 3,536 MMBtu $8.99
TOTAL ENERGY COSTS $594,601
RECOMMENDED SAVINGS* $120,385 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,434
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ Tgal $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$51,977
Cost:
$120
$38,206 778,151 $13,771 1,514 - - - - $38,206
778,151
kWh
$13,771
1,514
kW-months/year
-
-
Tgal
-
-
lb
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,457
Cost:
$5,400
$2,871 58,465 $1,586 247 - - - - $2,871
58,465
kWh
$1,586
247
kW-months/year
-
-
Tgal
-
-
lb
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,032
Cost:
$2
$4,013 81,733 $1,019 112 - - - - $4,013
81,733
kWh
$1,019
112
kW-months/year
-
-
Tgal
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$9,195
Cost:
$501
$7,333 149,348 $1,862 205 - - - - $7,333
149,348
kWh
$1,862
205
kW-months/year
-
-
Tgal
-
-
lb
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$41,601
Cost:
$43,021
$41,600 732,387 $1 1,409 - - - - $41,600
732,387
kWh
$1
1,409
kW-months/year
-
-
Tgal
-
-
lb
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$898
Cost:
$2,101
- - - - - - $898 72,800 -
-
kWh
-
-
kW-months/year
-
-
Tgal
$898
72,800
lb
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,228
Cost:
$257
- - - - - - $1,228 1,560 -
-
kWh
-
-
kW-months/year
-
-
Tgal
$1,228
1,560
lb
08: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$5,997
Cost:
$7,996
- - - - $5,997 21,600 - - -
-
kWh
-
-
kW-months/year
$5,997
21,600
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$120,385
Cost:
$59,398
$94,023 1,800,084 $18,239 3,487 $5,997 21,600 $2,126 74,360 $94,023
1,800,084
kWh
$18,239
3,487
kW-months/year
$5,997
21,600
Tgal
$2,126
74,360
lb
TOTAL IMPLEMENTED Savings:
$56,434
Cost:
$5,520
$41,077 836,616 $15,357 1,761 - - - - $41,077
836,616
kWh
$15,357
1,761
kW-months/year
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz)