IAC Assessment: BD0348
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0348
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2008
Principal Product Fasteners
NAICS 332722 - Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 190
Plant Area (Sq.Ft.) 145,000
Annual Production 1,300,000,000 Pieces
Production Hrs. Annual 4,992
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $752,679 17,271,036 kWh $0.04
Electricity Demand $315,446 24,567 kW-months/year $12.84
Electricity Fees $264,894 - $ -
Natural Gas $369,551 51,813 MMBtu $7.13
TOTAL ENERGY COSTS $1,733,585
RECOMMENDED SAVINGS* $332,665 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,613
Cost:
$24,066
$12,621 289,478 $6,992 545 - - - - - - $12,621
289,478
kWh
$6,992
545
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,392
Cost:
$2,026
$636 14,587 $756 59 - - - - - - $636
14,587
kWh
$756
59
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,758
Cost:
$2,001
- - - - $9,758 1,393 - - - - -
-
kWh
-
-
kW-months/year
$9,758
1,393
MMBtu
-
-
Tgal
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,081
Cost:
$2
$2,628 60,280 $2,453 191 - - - - - - $2,628
60,280
kWh
$2,453
191
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$142,941
Cost:
$1,401
$67,010 1,468,123 $75,931 3,577 - - - - - - $67,010
1,468,123
kWh
$75,931
3,577
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$7,689
Cost:
$5,001
- - - - $7,689 1,079 - - - - -
-
kWh
-
-
kW-months/year
$7,689
1,079
MMBtu
-
-
Tgal
-
-
$
07: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$50,882
Cost:
$42,001
- - - - $50,882 7,259 - - - - -
-
kWh
-
-
kW-months/year
$50,882
7,259
MMBtu
-
-
Tgal
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,743
Cost:
$7,844
$6,619 151,813 $3,124 243 - - - - - - $6,619
151,813
kWh
$3,124
243
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
09: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$54,402
Cost:
$12,001
- - - - - - $54,402 10,929,485 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$54,402
10,929,485
Tgal
-
-
$
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$31,164
Cost:
$7,000
- - - - - - - - $31,164 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$31,164
-
$
TOTAL RECOMMENDED Savings:
$332,665
Cost:
$103,343
$89,514 1,984,281 $89,256 4,615 $68,329 9,731 $54,402 10,929,485 $31,164 - $89,514
1,984,281
kWh
$89,256
4,615
kW-months/year
$68,329
9,731
MMBtu
$54,402
10,929,485
Tgal
$31,164
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes