IAC Assessment: BD0384
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0384
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2011
Principal Product Sewer cleaners
NAICS 336211 - Motor Vehicle Body Manufacturing
SIC 3713 - Truck And Bus Bodies
Sales $100,000,000-$500,000,000
# of Employees 427
Plant Area (Sq.Ft.) 250,000
Annual Production 606 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $206,150 4,741,888 kWh $0.04
Electricity Demand $67,828 11,869 kW-months/year $5.71
Electricity Fees $115,727 - $ -
Natural Gas $292,103 44,348 MMBtu $6.59
TOTAL ENERGY COSTS $693,494
RECOMMENDED SAVINGS* $111,857 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $89,054
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$50,720
Cost:
$73,600
- - - - $50,720 7,700 - - - - - - - - -
-
kWh
-
-
kW-months/year
$50,720
7,700
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$32,663
Cost:
$45,984
$24,198 574,779 $8,465 1,483 - - - - - - - - - - $24,198
574,779
kWh
$8,465
1,483
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
03: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$13,232
Cost:
$3,000
- - - - $13,232 1,575 - - - - - - - - -
-
kWh
-
-
kW-months/year
$13,232
1,575
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,079
Cost:
$1,400
$5,944 141,180 $1,550 272 - - - - $52 - - - $533 - $5,944
141,180
kWh
$1,550
272
kW-months/year
-
-
MMBtu
-
-
gal
$52
-
$
-
-
$
$533
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,049
Cost:
$5,100
$1,473 34,977 $576 101 - - - - - - - - - - $1,473
34,977
kWh
$576
101
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,941
Cost:
$2,000
$1,538 36,544 $403 71 - - - - - - - - - - $1,538
36,544
kWh
$403
71
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,067
Cost:
$1,067
$590 14,019 $477 84 - - - - - - - - - - $590
14,019
kWh
$477
84
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$614
Cost:
$525
$266 6,325 $49 9 - - - - $147 - - - $152 - $266
6,325
kWh
$49
9
kW-months/year
-
-
MMBtu
-
-
gal
$147
-
$
-
-
$
$152
-
$
09: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$949
Cost:
$705
$(-26) (-399) - - - - $1,975 2,462 - - $(-1,000) - - - $(-26)
(-399)
kWh
-
-
kW-months/year
-
-
MMBtu
$1,975
2,462
gal
-
-
$
$(-1,000)
-
$
-
-
$
10: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$543
Cost:
$20
- - $543 95 - - - - - - - - - - -
-
kWh
$543
95
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$111,857
Cost:
$133,401
$33,983 807,425 $12,063 2,113 $63,952 9,275 $1,975 2,462 $199 - $(-1,000) - $685 - $33,983
807,425
kWh
$12,063
2,113
kW-months/year
$63,952
9,275
MMBtu
$1,975
2,462
gal
$199
-
$
$(-1,000)
-
$
$685
-
$
TOTAL IMPLEMENTED Savings:
$89,054
Cost:
$128,276
$28,065 666,644 $9,970 1,747 $50,720 7,700 - - $147 - - - $152 - $28,065
666,644
kWh
$9,970
1,747
kW-months/year
$50,720
7,700
MMBtu
-
-
gal
$147
-
$
-
-
$
$152
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost