Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2012 |
Principal Product | Farm machinery |
NAICS | 333111 - Farm Machinery and Equipment Manufacturing |
SIC | 3523 - Farm Machinery And Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 72 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 250 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $42,901 | 468,780 | kWh | $0.09 |
Electricity Fees | $931 | - | $ | - |
LPG | $54,340 | 3,090 | MMBtu | $17.59 |
Fuel Oil #2 | $1,618 | 63 | MMBtu | $25.74 |
TOTAL ENERGY COSTS | $99,790 | |||
RECOMMENDED SAVINGS* | $37,153 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $923 |
#|Description |
Savings Cost |
Status | Electricity Usage | LPG | Fuel Oil #2 | Electricity Usage | LPG | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION |
Savings: $19,742 Cost: $54,000 |
$(-13,322) | (-145,600) | $31,446 | 1,780 | $1,618 | 62 |
$(-13,322) (-145,600) kWh |
$31,446 1,780 MMBtu |
$1,618 62 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $7,374 Cost: $17,400 |
- | - | $7,374 | 419 | - | - |
- - kWh |
$7,374 419 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,576 Cost: $11,333 |
$4,576 | 50,047 | - | - | - | - |
$4,576 50,047 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,552 Cost: $20 |
$1,552 | 16,604 | - | - | - | - |
$1,552 16,604 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,520 Cost: $1,275 |
$1,520 | 16,609 | - | - | - | - |
$1,520 16,609 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $923 Cost: $100 |
$923 | 10,093 | - | - | - | - |
$923 10,093 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $757 Cost: $1,700 |
$757 | 8,277 | - | - | - | - |
$757 8,277 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $709 Cost: $800 |
$709 | 7,584 | - | - | - | - |
$709 7,584 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $37,153 Cost: $86,628 |
$(-3,285) | (-36,386) | $38,820 | 2,199 | $1,618 | 62 | $(-3,285) (-36,386) kWh |
$38,820 2,199 MMBtu |
$1,618 62 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $923 Cost: $100 |
$923 | 10,093 | - | - | - | - | $923 10,093 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | LPG | Fuel Oil #2 | Electricity Usage | LPG | Fuel Oil #2 |