IAC Assessment: BD0405
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0405
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2012
Principal Product Electronic Assemblies
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $5,000,000-$10,000,000
# of Employees 36
Plant Area (Sq.Ft.) 23,000
Annual Production 225,000 Pieces
Production Hrs. Annual 2,080
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,868 636,305 kWh $0.08
Electricity Fees $16,339 - $ -
Natural Gas $5,146 606 MMBtu $8.49
TOTAL ENERGY COSTS $71,774
RECOMMENDED SAVINGS* $19,464 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,648
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,816
Cost:
$4,065
$1,816 23,157 - - $1,816
23,157
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,415
Cost:
$7,299
$4,415 56,315 - - $4,415
56,315
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,286
Cost:
$15,356
$7,286 92,937 - - $7,286
92,937
kWh
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,161
Cost:
$1,050
$2,161 27,564 - - $2,161
27,564
kWh
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$82
Cost:
$10
$82 1,098 - - $82
1,098
kWh
-
-
MMBtu
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,704
Cost:
$40,000
$3,006 38,343 $698 82 $3,006
38,343
kWh
$698
82
MMBtu
TOTAL RECOMMENDED Savings:
$19,464
Cost:
$67,780
$18,766 239,414 $698 82 $18,766
239,414
kWh
$698
82
MMBtu
TOTAL IMPLEMENTED Savings:
$17,648
Cost:
$63,715
$16,950 216,257 $698 82 $16,950
216,257
kWh
$698
82
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas