IAC Assessment: BD0424
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0424
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2013
Principal Product Fruit snacks
NAICS 311919 - Other Snack Food Manufacturing
SIC 2052 - Cookies And Crackers
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 256,750
Annual Production 70,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,143,882 13,084,656 kWh $0.09
Electricity Demand $125,062 24,287 kW-months/year $5.15
Electricity Fees $17,614 - $ -
Natural Gas $442,755 92,848 MMBtu $4.77
TOTAL ENERGY COSTS $1,798,105
RECOMMENDED SAVINGS* $137,249 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,982
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$51,971
Cost:
$201,300
$51,971 613,599 - - - - - - - - $51,971
613,599
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$29,607
Cost:
$16,210
$27,396 313,458 $2,211 429 - - - - - - $27,396
313,458
kWh
$2,211
429
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$14,355
Cost:
$25
$13,284 151,977 $1,071 208 - - - - - - $13,284
151,977
kWh
$1,071
208
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$12,401
Cost:
$2,700
$11,475 131,287 $926 180 - - - - - - $11,475
131,287
kWh
$926
180
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,527
Cost:
$8,640
$7,690 90,788 $640 124 - - $197 - - - $7,690
90,788
kWh
$640
124
kW-months/year
-
-
MMBtu
$197
-
$
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,030
Cost:
$11,000
- - - - $8,030 1,764 - - - - -
-
kWh
-
-
kW-months/year
$8,030
1,764
MMBtu
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,685
Cost:
$2,257
$7,166 84,605 $519 101 - - - - - - $7,166
84,605
kWh
$519
101
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.1222 INSTALL TURBULATORS Savings:
$3,136
Cost:
$3,000
- - - - $3,136 657 - - - - -
-
kWh
-
-
kW-months/year
$3,136
657
MMBtu
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,163
Cost:
$1,660
$194 2,289 $141 27 - - $346 - $482 - $194
2,289
kWh
$141
27
kW-months/year
-
-
MMBtu
$346
-
$
$482
-
$
10: 2.7134 USE PHOTOCELL CONTROLS Savings:
$374
Cost:
$435
$236 3,168 $80 16 - - $33 - $25 - $236
3,168
kWh
$80
16
kW-months/year
-
-
MMBtu
$33
-
$
$25
-
$
TOTAL RECOMMENDED Savings:
$137,249
Cost:
$247,227
$119,412 1,391,171 $5,588 1,085 $11,166 2,421 $576 - $507 - $119,412
1,391,171
kWh
$5,588
1,085
kW-months/year
$11,166
2,421
MMBtu
$576
-
$
$507
-
$
TOTAL IMPLEMENTED Savings:
$46,982
Cost:
$28,767
$42,446 491,140 $3,511 682 - - $543 - $482 - $42,446
491,140
kWh
$3,511
682
kW-months/year
-
-
MMBtu
$543
-
$
$482
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost