IAC Assessment: BD0454
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0454
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2015
Principal Product Custom machined parts
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 280
Plant Area (Sq.Ft.) 236,427
Annual Production 1,300,000 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $453,623 9,968,386 kWh $0.05
Electricity Demand $32,465 19,755 kW-months/year $1.64
Electricity Fees $8,257 - $ -
Natural Gas $70,035 8,710 MMBtu $8.04
TOTAL ENERGY COSTS $565,824
RECOMMENDED SAVINGS* $25,420 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,230
Cost:
$20
$4,891 107,490 $339 207 - - - - - - - - $4,891
107,490
kWh
$339
207
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,872
Cost:
$3,000
$1,487 32,695 $1,340 817 $1,045 130 - - - - - - $1,487
32,695
kWh
$1,340
817
kW-months/year
$1,045
130
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,717
Cost:
$1,400
$2,541 55,860 $176 107 - - - - - - - - $2,541
55,860
kWh
$176
107
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,875
Cost:
$1,450
- - - - $3,875 482 - - - - - - -
-
kWh
-
-
kW-months/year
$3,875
482
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,121
Cost:
$825
$1,075 23,622 $223 136 - - - - $416 - $407 - $1,075
23,622
kWh
$223
136
kW-months/year
-
-
MMBtu
-
-
lb
$416
-
$
$407
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,034
Cost:
$500
$1,902 41,802 $132 80 - - - - - - - - $1,902
41,802
kWh
$132
80
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,811
Cost:
$2,500
$1,694 37,240 $117 72 - - - - - - - - $1,694
37,240
kWh
$117
72
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,054
Cost:
$900
$1,054 23,178 - - - - - - - - - - $1,054
23,178
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$780
Cost:
$693
$671 14,344 $81 39 - - - - $8 - $20 - $671
14,344
kWh
$81
39
kW-months/year
-
-
MMBtu
-
-
lb
$8
-
$
$20
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$384
Cost:
$650
$196 4,327 $10 6 - - - - $74 - $104 - $196
4,327
kWh
$10
6
kW-months/year
-
-
MMBtu
-
-
lb
$74
-
$
$104
-
$
11: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$98
Cost:
$20
- - $98 60 - - - - - - - - -
-
kWh
$98
60
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
12: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,444
Cost:
$2,700
- - - - - - $1,444 72,800 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,444
72,800
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$25,420
Cost:
$14,658
$15,511 340,558 $2,516 1,524 $4,920 612 $1,444 72,800 $498 - $531 - $15,511
340,558
kWh
$2,516
1,524
kW-months/year
$4,920
612
MMBtu
$1,444
72,800
lb
$498
-
$
$531
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost