Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2015 |
Principal Product | Custom machined parts |
NAICS | 332710 - Machine Shops |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 280 |
Plant Area (Sq.Ft.) | 236,427 |
Annual Production | 1,300,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $453,623 | 9,968,386 | kWh | $0.05 |
Electricity Demand | $32,465 | 19,755 | kW-months/year | $1.64 |
Electricity Fees | $8,257 | - | $ | - |
Natural Gas | $70,035 | 8,710 | MMBtu | $8.04 |
TOTAL ENERGY COSTS | $565,824 | |||
RECOMMENDED SAVINGS* | $25,420 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,230 Cost: $20 |
$4,891 | 107,490 | $339 | 207 | - | - | - | - | - | - | - | - |
$4,891 107,490 kWh |
$339 207 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $3,872 Cost: $3,000 |
$1,487 | 32,695 | $1,340 | 817 | $1,045 | 130 | - | - | - | - | - | - |
$1,487 32,695 kWh |
$1,340 817 kW-months/year |
$1,045 130 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $2,717 Cost: $1,400 |
$2,541 | 55,860 | $176 | 107 | - | - | - | - | - | - | - | - |
$2,541 55,860 kWh |
$176 107 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $3,875 Cost: $1,450 |
- | - | - | - | $3,875 | 482 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,875 482 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $2,121 Cost: $825 |
$1,075 | 23,622 | $223 | 136 | - | - | - | - | $416 | - | $407 | - |
$1,075 23,622 kWh |
$223 136 kW-months/year |
- - MMBtu |
- - lb |
$416 - $ |
$407 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,034 Cost: $500 |
$1,902 | 41,802 | $132 | 80 | - | - | - | - | - | - | - | - |
$1,902 41,802 kWh |
$132 80 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,811 Cost: $2,500 |
$1,694 | 37,240 | $117 | 72 | - | - | - | - | - | - | - | - |
$1,694 37,240 kWh |
$117 72 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,054 Cost: $900 |
$1,054 | 23,178 | - | - | - | - | - | - | - | - | - | - |
$1,054 23,178 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $780 Cost: $693 |
$671 | 14,344 | $81 | 39 | - | - | - | - | $8 | - | $20 | - |
$671 14,344 kWh |
$81 39 kW-months/year |
- - MMBtu |
- - lb |
$8 - $ |
$20 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $384 Cost: $650 |
$196 | 4,327 | $10 | 6 | - | - | - | - | $74 | - | $104 | - |
$196 4,327 kWh |
$10 6 kW-months/year |
- - MMBtu |
- - lb |
$74 - $ |
$104 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $98 Cost: $20 |
- | - | $98 | 60 | - | - | - | - | - | - | - | - |
- - kWh |
$98 60 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $1,444 Cost: $2,700 |
- | - | - | - | - | - | $1,444 | 72,800 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,444 72,800 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $25,420 Cost: $14,658 |
$15,511 | 340,558 | $2,516 | 1,524 | $4,920 | 612 | $1,444 | 72,800 | $498 | - | $531 | - | $15,511 340,558 kWh |
$2,516 1,524 kW-months/year |
$4,920 612 MMBtu |
$1,444 72,800 lb |
$498 - $ |
$531 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |