Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2016 |
Principal Product | Mobile equipment for mining and metals industry |
NAICS | 336120 - Heavy Duty Truck Manufacturing |
SIC | 3799 - Transportation Equipment, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 203 |
Plant Area (Sq.Ft.) | 193,000 |
Annual Production | 50 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $208,146 | 3,730,900 | kWh | $0.06 |
Electricity Demand | $52,012 | 8,166 | kW-months/year | $6.37 |
Electricity Fees | $1,312 | - | $ | - |
Natural Gas | $84,815 | 13,960 | MMBtu | $6.08 |
LPG | $45,211 | 2,266 | MMBtu | $19.95 |
TOTAL ENERGY COSTS | $391,496 | |||
RECOMMENDED SAVINGS* | $133,132 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,716 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Primary Raw Material | Electricity Usage | Electricity Demand | LPG | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION |
Savings: $33,238 Cost: $59,500 |
$(-11,838) | (-212,160) | - | - | $45,076 | 2,256 | - | - |
$(-11,838) (-212,160) kWh |
- - kW-months/year |
$45,076 2,256 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,155 Cost: $5,111 |
$3,154 | 56,592 | $1,001 | 157 | - | - | - | - |
$3,154 56,592 kWh |
$1,001 157 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,962 Cost: $350 |
$2,981 | 53,402 | $981 | 154 | - | - | - | - |
$2,981 53,402 kWh |
$981 154 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,599 Cost: $20 |
$2,707 | 48,518 | $892 | 140 | - | - | - | - |
$2,707 48,518 kWh |
$892 140 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,185 Cost: $5,958 |
$1,659 | 29,727 | $526 | 83 | - | - | - | - |
$1,659 29,727 kWh |
$526 83 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,726 Cost: $1,600 |
$1,299 | 23,287 | $427 | 67 | - | - | - | - |
$1,299 23,287 kWh |
$427 67 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,569 Cost: $3,950 |
$967 | 17,324 | $602 | 95 | - | - | - | - |
$967 17,324 kWh |
$602 95 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $273 Cost: $450 |
$183 | 3,280 | $90 | 14 | - | - | - | - |
$183 3,280 kWh |
$90 14 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $82,425 Cost: $18,000 |
- | - | - | - | - | - | $82,425 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$82,425 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $133,132 Cost: $94,939 |
$1,112 | 19,970 | $4,519 | 710 | $45,076 | 2,256 | $82,425 | - | $1,112 19,970 kWh |
$4,519 710 kW-months/year |
$45,076 2,256 MMBtu |
$82,425 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,716 Cost: $5,481 |
$8,842 | 158,512 | $2,874 | 451 | - | - | - | - | $8,842 158,512 kWh |
$2,874 451 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Primary Raw Material | Electricity Usage | Electricity Demand | LPG | Primary Raw Material |