IAC Assessment: BD0485
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0485
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2016
Principal Product Mobile equipment for mining and metals industry
NAICS 336120 - Heavy Duty Truck Manufacturing
SIC 3799 - Transportation Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 203
Plant Area (Sq.Ft.) 193,000
Annual Production 50 Pieces
Production Hrs. Annual 4,160
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $208,146 3,730,900 kWh $0.06
Electricity Demand $52,012 8,166 kW-months/year $6.37
Electricity Fees $1,312 - $ -
Natural Gas $84,815 13,960 MMBtu $6.08
LPG $45,211 2,266 MMBtu $19.95
TOTAL ENERGY COSTS $391,496
RECOMMENDED SAVINGS* $133,132 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,716
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Primary Raw Material Electricity Usage Electricity Demand LPG Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$33,238
Cost:
$59,500
$(-11,838) (-212,160) - - $45,076 2,256 - - $(-11,838)
(-212,160)
kWh
-
-
kW-months/year
$45,076
2,256
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,155
Cost:
$5,111
$3,154 56,592 $1,001 157 - - - - $3,154
56,592
kWh
$1,001
157
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,962
Cost:
$350
$2,981 53,402 $981 154 - - - - $2,981
53,402
kWh
$981
154
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,599
Cost:
$20
$2,707 48,518 $892 140 - - - - $2,707
48,518
kWh
$892
140
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,185
Cost:
$5,958
$1,659 29,727 $526 83 - - - - $1,659
29,727
kWh
$526
83
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,726
Cost:
$1,600
$1,299 23,287 $427 67 - - - - $1,299
23,287
kWh
$427
67
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,569
Cost:
$3,950
$967 17,324 $602 95 - - - - $967
17,324
kWh
$602
95
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$273
Cost:
$450
$183 3,280 $90 14 - - - - $183
3,280
kWh
$90
14
kW-months/year
-
-
MMBtu
-
-
$
09: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$82,425
Cost:
$18,000
- - - - - - $82,425 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$82,425
-
$
TOTAL RECOMMENDED Savings:
$133,132
Cost:
$94,939
$1,112 19,970 $4,519 710 $45,076 2,256 $82,425 - $1,112
19,970
kWh
$4,519
710
kW-months/year
$45,076
2,256
MMBtu
$82,425
-
$
TOTAL IMPLEMENTED Savings:
$11,716
Cost:
$5,481
$8,842 158,512 $2,874 451 - - - - $8,842
158,512
kWh
$2,874
451
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand LPG Primary Raw Material Electricity Usage Electricity Demand LPG Primary Raw Material