IAC logo
IAC Assessment: BS0058
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0058
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2015
Principal Product Lumber (Board Ft.)
NAICS 321912 - Cut Stock, Resawing Lumber, and Planing
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 67
Plant Area (Sq.Ft.) 2,479,339
Annual Production 80,000 Thousand Feet
Production Hrs. Annual 4,200
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $886,545 16,776,812 kWh $0.05
Electricity Demand $263,768 33,452 kW-months/year $7.88
Wood $425 142 MMBtu $3.00
TOTAL ENERGY COSTS $1,150,738
RECOMMENDED SAVINGS* $22,711 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Electricity Usage Electricity Demand Wood
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,953
Cost:
$9,195
$1,361 25,688 $591 75 - - $1,361
25,688
kWh
$591
75
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,672
Cost:
$422
$2,220 41,890 $452 57 - - $2,220
41,890
kWh
$452
57
kW-months/year
-
-
MMBtu
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$576
Cost:
$500
$311 5,873 $265 34 - - $311
5,873
kWh
$265
34
kW-months/year
-
-
MMBtu
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$273
Cost:
$739
- - - - $273 91 -
-
kWh
-
-
kW-months/year
$273
91
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,259
Cost:
$18,330
$3,556 67,094 $1,703 216 - - $3,556
67,094
kWh
$1,703
216
kW-months/year
-
-
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,480
Cost:
$750
$2,480 46,800 - - - - $2,480
46,800
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$9,497
Cost:
$220
$9,497 179,192 - - - - $9,497
179,192
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$22,711
Cost:
$30,156
$19,426 366,537 $3,011 382 $273 91 $19,426
366,537
kWh
$3,011
382
kW-months/year
$273
91
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Wood Electricity Usage Electricity Demand Wood