Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of California, Irvine |
---|---|
Assessment Year | 2024 |
Principal Product | Lighting Fixtures |
NAICS | 335121 - Residential Electric Lighting Fixture Manufacturing |
SIC | 3645 - Residential Lighting Fixtures |
Sales | $5,000,000-$10,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 75,000 |
Annual Production | 1,000,000 Units |
Production Hrs. Annual | 2,754 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $60,579 | 491,958 | kWh | $0.12 |
Electricity Demand | $89,601 | 2,459 | kW-months/year | $36.44 |
Electricity Fees | $11,806 | - | $ | - |
Natural Gas | $3,351 | 216 | MMBtu | $15.51 |
LPG | $7,312 | 845 | MMBtu | $8.65 |
Other Gas | $1,083 | 1 | MMBtu | $1,083.00 |
TOTAL ENERGY COSTS | $281,411 | |||
RECOMMENDED SAVINGS* | $182,585 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | LPG | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $74,767 Cost: $25,940 |
$7,267 | 59,034 | - | - | - | - | - | - | - | - | - | - | - | - | $67,500 | - |
$7,267 59,034 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
$67,500 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $35,594 Cost: $236,068 |
$25,852 | 210,007 | $9,742 | 267 | - | - | - | - | - | - | - | - | - | - | - | - |
$25,852 210,007 kWh |
$9,742 267 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $20,579 Cost: $1,600 |
$9,330 | 75,579 | $11,249 | 309 | - | - | - | - | - | - | - | - | - | - | - | - |
$9,330 75,579 kWh |
$11,249 309 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $11,559 Cost: $3,600 |
$11,559 | 93,900 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$11,559 93,900 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,720 Cost: $13,500 |
$4,400 | 35,741 | $5,320 | 146 | - | - | - | - | - | - | - | - | - | - | - | - |
$4,400 35,741 kWh |
$5,320 146 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $7,648 Cost: $8,750 |
- | - | - | - | - | - | - | - | $7,648 | 13,250 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$7,648 13,250 lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $4,500 Cost: $2,000 |
- | - | - | - | - | - | $4,500 | 60 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,500 60 gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $4,373 Cost: $50 |
- | - | $4,373 | 120 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$4,373 120 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,616 Cost: $1,575 |
$2,002 | 16,264 | $1,614 | 44 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,002 16,264 kWh |
$1,614 44 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $2,495 Cost: $36,000 |
$(-2,718) | (-22,080) | $(-2,099) | (-58) | $7,312 | 845 | - | - | - | - | - | - | - | - | - | - |
$(-2,718) (-22,080) kWh |
$(-2,099) (-58) kW-months/year |
$7,312 845 MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $2,356 Cost: $960 |
$425 | 3,454 | $1,828 | 50 | - | - | - | - | - | - | $47 | - | $56 | - | - | - |
$425 3,454 kWh |
$1,828 50 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$47 - $ |
$56 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,140 Cost: $860 |
$934 | 7,591 | $1,206 | 33 | - | - | - | - | - | - | - | - | - | - | - | - |
$934 7,591 kWh |
$1,206 33 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $2,023 Cost: $18,000 |
$2,023 | 16,436 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$2,023 16,436 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,215 Cost: $740 |
$634 | 5,152 | $581 | 16 | - | - | - | - | - | - | - | - | - | - | - | - |
$634 5,152 kWh |
$581 16 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $182,585 Cost: $349,643 |
$61,708 | 501,078 | $33,814 | 928 | $7,312 | 845 | $4,500 | 60 | $7,648 | 13,250 | $47 | - | $56 | - | $67,500 | - | $61,708 501,078 kWh |
$33,814 928 kW-months/year |
$7,312 845 MMBtu |
$4,500 60 gal |
$7,648 13,250 lb |
$47 - $ |
$56 - $ |
$67,500 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | LPG | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production |