IAC logo
IAC Assessment: CL2001
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CL2001
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2020
Principal Product Medical supplies - adult incontinence products
NAICS 322291 - Sanitary Paper Product Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 500
Plant Area (Sq.Ft.) 669,200
Annual Production 1,000,000 Units
Production Hrs. Annual 6,500
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,906,877 50,081,000 kWh $0.04
Electricity Demand $990,742 112,701 kW-months/year $8.79
Electricity Fees $39,784 - $ -
Natural Gas $202,345 25,474,800 MMBtu $0.01
TOTAL ENERGY COSTS $3,139,748
RECOMMENDED SAVINGS* $633,656 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,554
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$40,200
Cost:
$61,410
$27,571 738,017 $12,629 1,461 - - $27,571
738,017
kWh
$12,629
1,461
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$584,752
Cost:
$499,000
$409,771 10,783,459 $174,981 19,906 - - $409,771
10,783,459
kWh
$174,981
19,906
kW-months/year
-
-
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,354
Cost:
-
- - $8,354 950 - - -
-
kWh
$8,354
950
kW-months/year
-
-
MMBtu
04: 2.6213 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS Savings:
$350
Cost:
-
- - - - $350 43,767 -
-
kWh
-
-
kW-months/year
$350
43,767
MMBtu
TOTAL RECOMMENDED Savings:
$633,656
Cost:
$560,410
$437,342 11,521,476 $195,964 22,317 $350 43,767 $437,342
11,521,476
kWh
$195,964
22,317
kW-months/year
$350
43,767
MMBtu
TOTAL IMPLEMENTED Savings:
$48,554
Cost:
$61,410
$27,571 738,017 $20,983 2,411 - - $27,571
738,017
kWh
$20,983
2,411
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas