IAC Assessment: CO0026
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0026
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1985
Principal Product DENTAL HARDWARE
NAICS n/a
SIC 3843 - Dental Equipment And Supplies
Sales $10,000,000-$50,000,000
# of Employees 325
Plant Area (Sq.Ft.) 0
Annual Production 20,000,000 Pieces
Production Hrs. Annual 3,250
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,256 1,890,973 kWh $0.07
Natural Gas $34,901 7,051 MMBtu $4.95
TOTAL ENERGY COSTS $160,157
RECOMMENDED SAVINGS* $35,116 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,312
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,177
Cost:
$6,312
$5,177 78,253 - - $5,177
78,253
kWh
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,652
Cost:
$300
- - $1,652 334 -
-
kWh
$1,652
334
MMBtu
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$5,931
Cost:
$3,500
$5,931 - - - $5,931
-
kWh
-
-
MMBtu
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$49
Cost:
$50
$49 879 - - $49
879
kWh
-
-
MMBtu
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$20,318
Cost:
$25,000
$10,716 161,782 $9,602 1,940 $10,716
161,782
kWh
$9,602
1,940
MMBtu
06: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$519
Cost:
$3,500
- - $519 105 -
-
kWh
$519
105
MMBtu
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$932
Cost:
$200
$564 8,499 $368 74 $564
8,499
kWh
$368
74
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$165
Cost:
$200
$165 2,638 - - $165
2,638
kWh
-
-
MMBtu
09: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$373
Cost:
$2,000
$373 5,569 - - $373
5,569
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$35,116
Cost:
$41,062
$22,975 257,620 $12,141 2,453 $22,975
257,620
kWh
$12,141
2,453
MMBtu
TOTAL IMPLEMENTED Savings:
$27,312
Cost:
$31,812
$16,058 242,673 $11,254 2,274 $16,058
242,673
kWh
$11,254
2,274
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas