IAC logo
IAC Assessment: CO0068
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0068
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1986
Principal Product SAUSASGE,LUNCHMEATS,WIENER
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 30,000,000 Tons
Production Hrs. Annual 6,240
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $354,546 7,939,039 kWh $0.04
Natural Gas $300,308 74,218 MMBtu $4.05
TOTAL ENERGY COSTS $654,854
RECOMMENDED SAVINGS* $102,604 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,600
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$17,856
Cost:
$700
- - $17,856 4,409 -
-
kWh
$17,856
4,409
MMBtu
02: 2.1222 INSTALL TURBULATORS Savings:
$9,291
Cost:
$1,200
- - $9,291 2,294 -
-
kWh
$9,291
2,294
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$15,058
Cost:
$18,000
- - $15,058 3,718 -
-
kWh
$15,058
3,718
MMBtu
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$17,236
Cost:
$7,400
$17,236 - - - $17,236
-
kWh
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$6,055
Cost:
$14,709
- - $6,055 1,495 -
-
kWh
$6,055
1,495
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,990
Cost:
$4,274
- - $5,990 1,479 -
-
kWh
$5,990
1,479
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,985
Cost:
$300
$7,985 178,781 - - $7,985
178,781
kWh
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,126
Cost:
$500
$1,126 25,205 - - $1,126
25,205
kWh
-
-
MMBtu
09: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$8,116
Cost:
-
$8,116 181,712 - - $8,116
181,712
kWh
-
-
MMBtu
10: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$1,616
Cost:
$2,600
- - $1,616 399 -
-
kWh
$1,616
399
MMBtu
11: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,009
Cost:
$600
- - $2,009 496 -
-
kWh
$2,009
496
MMBtu
12: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$2,238
Cost:
$1,800
$2,238 50,117 - - $2,238
50,117
kWh
-
-
MMBtu
13: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,187
Cost:
$154
$183 4,103 $1,004 248 $183
4,103
kWh
$1,004
248
MMBtu
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,370
Cost:
$1,214
$6,370 142,732 - - $6,370
142,732
kWh
-
-
MMBtu
15: 2.2511 INSULATE BARE EQUIPMENT Savings:
$471
Cost:
$291
$471 10,551 - - $471
10,551
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$102,604
Cost:
$53,742
$43,725 593,201 $58,879 14,538 $43,725
593,201
kWh
$58,879
14,538
MMBtu
TOTAL IMPLEMENTED Savings:
$44,600
Cost:
$22,214
$17,064 382,181 $27,536 6,799 $17,064
382,181
kWh
$27,536
6,799
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas