IAC logo
IAC Assessment: CO0285
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0285
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1993
Principal Product Aircraft crew seats
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 183
Plant Area (Sq.Ft.) 115,000
Annual Production 1,128 Pieces
Production Hrs. Annual 5,746
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,751 3,291,032 kWh $0.05
Natural Gas $43,007 11,171 MMBtu $3.85
TOTAL ENERGY COSTS $192,758
RECOMMENDED SAVINGS* $124,090 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Primary Raw Material Electricity Usage Natural Gas Administrative Changes Primary Raw Material
$ kWh $ MMBtu $ $ $ $
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$92,610
Cost:
$6,220
- - - - - - $92,610 - -
-
kWh
-
-
MMBtu
-
-
$
$92,610
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,680
Cost:
$2,010
- - $9,680 2,515 - - - - -
-
kWh
$9,680
2,515
MMBtu
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,720
Cost:
$8,500
$5,720 125,733 - - - - - - $5,720
125,733
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,170
Cost:
$7,020
$5,170 113,716 - - - - - - $5,170
113,716
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,840
Cost:
$130
$1,840 40,445 - - - - - - $1,840
40,445
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,400
Cost:
$480
$1,400 30,774 - - - - - - $1,400
30,774
kWh
-
-
MMBtu
-
-
$
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,540
Cost:
$750
$770 28,136 $770 199 - - - - $770
28,136
kWh
$770
199
MMBtu
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,540
Cost:
$1,000
$1,540 33,998 - - - - - - $1,540
33,998
kWh
-
-
MMBtu
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,470
Cost:
$3,320
$1,470 32,239 - - - - - - $1,470
32,239
kWh
-
-
MMBtu
-
-
$
-
-
$
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,290
Cost:
$2,790
$1,290 28,429 - - - - - - $1,290
28,429
kWh
-
-
MMBtu
-
-
$
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$860
Cost:
$400
$860 18,757 - - - - - - $860
18,757
kWh
-
-
MMBtu
-
-
$
-
-
$
12: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$660
Cost:
$120
- - - - $660 - - - -
-
kWh
-
-
MMBtu
$660
-
$
-
-
$
13: 2.7134 USE PHOTOCELL CONTROLS Savings:
$310
Cost:
$560
$310 6,741 - - - - - - $310
6,741
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$124,090
Cost:
$33,300
$20,370 458,968 $10,450 2,714 $660 - $92,610 - $20,370
458,968
kWh
$10,450
2,714
MMBtu
$660
-
$
$92,610
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Administrative Changes Primary Raw Material Electricity Usage Natural Gas Administrative Changes Primary Raw Material