IAC Assessment: CO0363
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0363
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1996
Principal Product refurbished folding carton machinery
NAICS n/a
SIC 3554 - Paper Industries Machinery
Sales $1,000,000-$5,000,000
# of Employees 80
Plant Area (Sq.Ft.) 32,000
Annual Production 72,000 Pieces
Production Hrs. Annual 6,240
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,064 598,769 kWh $0.03
Electricity Demand $15,784 1,570 kW-months/year $10.05
Electricity Fees $(-459) - $ -
Natural Gas $6,056 1,728 MMBtu $3.50
TOTAL ENERGY COSTS $45,615
RECOMMENDED SAVINGS* $32,059 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $859
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$21,800
Cost:
$14,040
$3,080 96,717 - - - - - - - - $18,720 - $3,080
96,717
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
$18,720
-
$
02: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$4,360
Cost:
$1,560
- - - - $4,800 90 - - $(-440) - - - -
-
kWh
-
-
kW-months/year
$4,800
90
gal
-
-
$
$(-440)
-
$
-
-
$
03: 3.8125 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER Savings:
$2,730
Cost:
$1,350
- - - - - - $1,300 - $1,430 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$1,300
-
$
$1,430
-
$
-
-
$
04: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$2,310
Cost:
$11,720
- - - - $250 1,080 - - $2,060 - - - -
-
kWh
-
-
kW-months/year
$250
1,080
gal
-
-
$
$2,060
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$554
Cost:
$2,458
$263 8,206 $291 29 - - - - - - - - $263
8,206
kWh
$291
29
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$85
Cost:
$83
$61 2,052 $24 2 - - - - - - - - $61
2,052
kWh
$24
2
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$220
Cost:
$180
$140 4,396 $80 8 - - - - - - - - $140
4,396
kWh
$80
8
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$32,059
Cost:
$31,391
$3,544 111,371 $395 39 $5,050 1,170 $1,300 - $3,050 - $18,720 - $3,544
111,371
kWh
$395
39
kW-months/year
$5,050
1,170
gal
$1,300
-
$
$3,050
-
$
$18,720
-
$
TOTAL IMPLEMENTED Savings:
$859
Cost:
$2,721
$464 14,654 $395 39 - - - - - - - - $464
14,654
kWh
$395
39
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product