IAC logo
IAC Assessment: CO0376
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0376
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1996
Principal Product large diameter welded steel pipe
NAICS n/a
SIC 3317 - Steel Pipe And Tubes
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 133,900
Annual Production 26,000 Tons
Production Hrs. Annual 5,200
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,679 3,744,431 kWh $0.02
Electricity Demand $155,007 12,149 kW-months/year $12.76
Electricity Fees $9,057 - $ -
Natural Gas $89,456 52,178 MMBtu $1.71
TOTAL ENERGY COSTS $353,749
RECOMMENDED SAVINGS* $19,365 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,908
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,040
Cost:
$1,000
- - $8,040 1,788 - - -
-
kWh
$8,040
1,788
kW-months/year
-
-
lb
02: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$7,040
Cost:
-
- - - - $7,040 193,920 -
-
kWh
-
-
kW-months/year
$7,040
193,920
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$518
Cost:
$470
$115 5,569 $403 32 - - $115
5,569
kWh
$403
32
kW-months/year
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$417
Cost:
$1,818
$98 4,689 $319 25 - - $98
4,689
kWh
$319
25
kW-months/year
-
-
lb
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,380
Cost:
$500
$580 27,257 $800 63 - - $580
27,257
kWh
$800
63
kW-months/year
-
-
lb
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,320
Cost:
$350
$560 26,084 $760 60 - - $560
26,084
kWh
$760
60
kW-months/year
-
-
lb
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$650
Cost:
$2,620
$80 3,810 $570 44 - - $80
3,810
kWh
$570
44
kW-months/year
-
-
lb
TOTAL RECOMMENDED Savings:
$19,365
Cost:
$6,758
$1,433 67,409 $10,892 2,012 $7,040 193,920 $1,433
67,409
kWh
$10,892
2,012
kW-months/year
$7,040
193,920
lb
TOTAL IMPLEMENTED Savings:
$10,908
Cost:
$3,940
$1,335 62,720 $2,533 199 $7,040 193,920 $1,335
62,720
kWh
$2,533
199
kW-months/year
$7,040
193,920
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)