Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1998 |
Principal Product | thermoformed plastic components & packages |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 73 |
Plant Area (Sq.Ft.) | 41,750 |
Annual Production | 416,000,000 Pieces |
Production Hrs. Annual | 5,200 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $34,916 | 2,113,423 | kWh | $0.02 |
Electricity Demand | $68,547 | 5,080 | kW-months/year | $13.49 |
Electricity Fees | $1,581 | - | $ | - |
Natural Gas | $5,289 | 1,190 | MMBtu | $4.44 |
TOTAL ENERGY COSTS | $110,333 | |||
RECOMMENDED SAVINGS* | $12,966 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,850 Cost: $3,500 |
- | - | - | - | $1,850 | 393 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,850 393 MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $586 Cost: $334 |
$191 | 11,137 | $395 | 29 | - | - | - | - | - | - | - | - | - | - | - | - |
$191 11,137 kWh |
$395 29 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $810 Cost: $1,580 |
- | - | $810 | 60 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$810 60 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $700 Cost: $1,250 |
$250 | 14,654 | $450 | 33 | - | - | - | - | - | - | - | - | - | - | - | - |
$250 14,654 kWh |
$450 33 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $100 Cost: $238 |
$30 | 1,758 | $70 | 5 | - | - | - | - | - | - | - | - | - | - | - | - |
$30 1,758 kWh |
$70 5 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS |
Savings: $4,830 Cost: $2,450 |
- | - | - | - | - | - | $5,020 | 926 | - | - | - | - | $(-190) | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,020 926 gal |
- - lb |
- - $ |
$(-190) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS |
Savings: $420 Cost: - |
- | - | - | - | - | - | $210 | 160 | - | - | $150 | - | $60 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$210 160 gal |
- - lb |
$150 - $ |
$60 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $330 Cost: - |
- | - | - | - | - | - | - | - | $330 | 66 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$330 66 lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES |
Savings: $3,340 Cost: $400 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | $3,340 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
$3,340 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,966 Cost: $9,752 |
$471 | 27,549 | $1,725 | 127 | $1,850 | 393 | $5,230 | 1,086 | $330 | 66 | $150 | - | $(-130) | - | $3,340 | - | $471 27,549 kWh |
$1,725 127 kW-months/year |
$1,850 393 MMBtu |
$5,230 1,086 gal |
$330 66 lb |
$150 - $ |
$(-130) - $ |
$3,340 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | Primary Product |