IAC Assessment: CO0494
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0494
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2001
Principal Product corrugated cardboard containers
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 1,230
Plant Area (Sq.Ft.) 223,200
Annual Production 825,500 Thousand Feet
Production Hrs. Annual 5,460
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,028 6,253,240 kWh $0.02
Electricity Demand $170,889 13,194 kW-months/year $12.95
Electricity Fees $1,521 - $ -
Natural Gas $344,446 59,117 MMBtu $5.83
TOTAL ENERGY COSTS $624,324
RECOMMENDED SAVINGS* $24,370 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,280
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$17,000
Cost:
$12,000
- - $17,000 1,320 - - - - - - -
-
kWh
$17,000
1,320
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,820
Cost:
$250
$3,070 200,000 $3,530 274 - - $(-780) - - - $3,070
200,000
kWh
$3,530
274
kW-months/year
-
-
MMBtu
$(-780)
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,090
Cost:
$800
- - - - $1,090 128 - - - - -
-
kWh
-
-
kW-months/year
$1,090
128
MMBtu
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$80
Cost:
$199
$28 1,840 $52 4 - - - - - - $28
1,840
kWh
$52
4
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$380
Cost:
-
$1,000 65,000 $1,610 125 - - $(-960) - $(-1,270) - $1,000
65,000
kWh
$1,610
125
kW-months/year
-
-
MMBtu
$(-960)
-
$
$(-1,270)
-
$
TOTAL RECOMMENDED Savings:
$24,370
Cost:
$13,249
$4,098 266,840 $22,192 1,723 $1,090 128 $(-1,740) - $(-1,270) - $4,098
266,840
kWh
$22,192
1,723
kW-months/year
$1,090
128
MMBtu
$(-1,740)
-
$
$(-1,270)
-
$
TOTAL IMPLEMENTED Savings:
$6,280
Cost:
$449
$4,098 266,840 $5,192 403 - - $(-1,740) - $(-1,270) - $4,098
266,840
kWh
$5,192
403
kW-months/year
-
-
MMBtu
$(-1,740)
-
$
$(-1,270)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost