IAC logo
IAC Assessment: CO0617
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0617
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2008
Principal Product Kitchen cabinets
NAICS 337110 - Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434 - Wood Kitchen Cabinets
Sales $1,000,000-$5,000,000
# of Employees 383
Plant Area (Sq.Ft.) 385,000
Annual Production 484,000 Pieces
Production Hrs. Annual 5,345
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $257,716 6,117,600 kWh $0.04
Electricity Demand $99,120 13,992 kW-months/year $7.08
Electricity Fees $69,283 - $ -
Natural Gas $68,641 6,624 MMBtu $10.36
TOTAL ENERGY COSTS $494,760
RECOMMENDED SAVINGS* $136,705 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$15,060
Cost:
$2,000
$10,640 181,300 $4,420 349 - - - - - - - - $10,640
181,300
kWh
$4,420
349
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$11,030
Cost:
-
$11,030 204,300 - - - - - - - - - - $11,030
204,300
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,850
Cost:
-
$2,850 70,600 - - - - - - - - - - $2,850
70,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,320
Cost:
$7,440
$1,370 26,200 $950 75 - - - - - - - - $1,370
26,200
kWh
$950
75
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$525
Cost:
$1,158
$310 5,918 $215 17 - - - - - - - - $310
5,918
kWh
$215
17
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$72,640
Cost:
$127,860
$51,410 1,081,200 $20,680 1,632 - - $670 - - - $(-120) - $51,410
1,081,200
kWh
$20,680
1,632
kW-months/year
-
-
MMBtu
$670
-
$
-
-
$
$(-120)
-
$
07: 2.7122 DISCONNECT BALLASTS Savings:
$22,520
Cost:
$6,560
$15,430 329,000 $5,710 451 - - $1,830 - - - $(-450) - $15,430
329,000
kWh
$5,710
451
kW-months/year
-
-
MMBtu
$1,830
-
$
-
-
$
$(-450)
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$5,120
Cost:
$61,600
$1,280 21,800 $1,010 80 - - - - $2,830 - - - $1,280
21,800
kWh
$1,010
80
kW-months/year
-
-
MMBtu
-
-
$
$2,830
-
$
-
-
$
09: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,640
Cost:
$90,000
$(-2,870) (-61,300) $(-1,060) (-84) $8,570 776 - - - - - - $(-2,870)
(-61,300)
kWh
$(-1,060)
(-84)
kW-months/year
$8,570
776
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$136,705
Cost:
$296,618
$91,450 1,859,018 $31,925 2,520 $8,570 776 $2,500 - $2,830 - $(-570) - $91,450
1,859,018
kWh
$31,925
2,520
kW-months/year
$8,570
776
MMBtu
$2,500
-
$
$2,830
-
$
$(-570)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost