IAC logo
IAC Assessment: DS0056
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0056
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Molded and Printed Plastic Parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 132
Plant Area (Sq.Ft.) 73,342
Annual Production 33,000,000 Pieces
Production Hrs. Annual 6,864
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,771 1,815,944 kWh $0.03
Electricity Demand $51,477 7,356 kW-months/year $7.00
Electricity Fees $1,031 - $ -
Natural Gas $4,584 798 MMBtu $5.74
TOTAL ENERGY COSTS $122,455
RECOMMENDED SAVINGS* $12,601 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,100
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,100
Cost:
$28,666
$4,261 129,250 $3,839 548 - - $4,261
129,250
kWh
$3,839
548
kW-months/year
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,391
Cost:
$4,503
$566 17,292 $825 118 - - $566
17,292
kWh
$825
118
kW-months/year
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$680
Cost:
-
- - $680 130 - - -
-
kWh
$680
130
kW-months/year
-
-
$
04: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$1,470
Cost:
$4,800
- - - - $1,470 - -
-
kWh
-
-
kW-months/year
$1,470
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$960
Cost:
$80
- - $960 480 - - -
-
kWh
$960
480
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$12,601
Cost:
$38,049
$4,827 146,542 $6,304 1,276 $1,470 - $4,827
146,542
kWh
$6,304
1,276
kW-months/year
$1,470
-
$
TOTAL IMPLEMENTED Savings:
$8,100
Cost:
$28,666
$4,261 129,250 $3,839 548 - - $4,261
129,250
kWh
$3,839
548
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost