Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | South Dakota State |
---|---|
Assessment Year | 1998 |
Principal Product | Thermal injection moldings |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 190 |
Plant Area (Sq.Ft.) | 92,000 |
Annual Production | 4,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | MN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $193,687 | 4,646,835 | kWh | $0.04 |
Electricity Demand | $24,353 | 11,666 | kW-months/year | $2.09 |
Electricity Fees | $3,543 | - | $ | - |
Natural Gas | $23,561 | 4,133 | MMBtu | $5.70 |
TOTAL ENERGY COSTS | $294,547 | |||
RECOMMENDED SAVINGS* | $40,456 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,604 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,394 Cost: $7,486 |
$5,910 | 140,680 | $484 | 209 | - | - | - | - | - | - |
$5,910 140,680 kWh |
$484 209 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $11,145 Cost: - |
- | - | $11,145 | 2,748 | - | - | - | - | - | - |
- - kWh |
$11,145 2,748 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1335 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS |
Savings: $10,786 Cost: $30,000 |
- | - | - | - | - | - | - | - | $10,786 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - lb |
$10,786 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $9,066 Cost: $4,500 |
- | - | - | - | - | - | $9,066 | 188,200 | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$9,066 188,200 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $3,065 Cost: $1,600 |
- | - | - | - | $3,065 | 1,021,766 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,065 1,021,766 Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $40,456 Cost: $43,586 |
$5,910 | 140,680 | $11,629 | 2,957 | $3,065 | 1,021,766 | $9,066 | 188,200 | $10,786 | - | $5,910 140,680 kWh |
$11,629 2,957 kW-months/year |
$3,065 1,021,766 Tgal |
$9,066 188,200 lb |
$10,786 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,604 Cost: $9,086 |
$5,910 | 140,680 | $11,629 | 2,957 | $3,065 | 1,021,766 | - | - | - | - | $5,910 140,680 kWh |
$11,629 2,957 kW-months/year |
$3,065 1,021,766 Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes |