IAC logo
IAC Assessment: DS0111
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0111
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1998
Principal Product Thermal injection moldings
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 190
Plant Area (Sq.Ft.) 92,000
Annual Production 4,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,687 4,646,835 kWh $0.04
Electricity Demand $24,353 11,666 kW-months/year $2.09
Electricity Fees $3,543 - $ -
Natural Gas $23,561 4,133 MMBtu $5.70
TOTAL ENERGY COSTS $294,547
RECOMMENDED SAVINGS* $40,456 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,604
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ Tgal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,394
Cost:
$7,486
$5,910 140,680 $484 209 - - - - - - $5,910
140,680
kWh
$484
209
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$11,145
Cost:
-
- - $11,145 2,748 - - - - - - -
-
kWh
$11,145
2,748
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
03: 2.1335 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS Savings:
$10,786
Cost:
$30,000
- - - - - - - - $10,786 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$10,786
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$9,066
Cost:
$4,500
- - - - - - $9,066 188,200 - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$9,066
188,200
lb
-
-
$
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$3,065
Cost:
$1,600
- - - - $3,065 1,021,766 - - - - -
-
kWh
-
-
kW-months/year
$3,065
1,021,766
Tgal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$40,456
Cost:
$43,586
$5,910 140,680 $11,629 2,957 $3,065 1,021,766 $9,066 188,200 $10,786 - $5,910
140,680
kWh
$11,629
2,957
kW-months/year
$3,065
1,021,766
Tgal
$9,066
188,200
lb
$10,786
-
$
TOTAL IMPLEMENTED Savings:
$20,604
Cost:
$9,086
$5,910 140,680 $11,629 2,957 $3,065 1,021,766 - - - - $5,910
140,680
kWh
$11,629
2,957
kW-months/year
$3,065
1,021,766
Tgal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes