IAC Assessment: GT0156
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0156
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1983
Principal Product WOVEN LINEN & POLYESTER
NAICS n/a
SIC 2221 - Broadwoven Fabric Mills, Manmade
Sales $10,000,000-$50,000,000
# of Employees 361
Plant Area (Sq.Ft.) 0
Annual Production 3,200 Tons
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,091,144 27,900,059 kWh $0.04
Natural Gas $153,366 43,813 MMBtu $3.50
Fuel Oil #6 $34,255 6,506 MMBtu $5.27
TOTAL ENERGY COSTS $1,278,765
RECOMMENDED SAVINGS* $78,713 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $57,384
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #6 Electricity Usage Natural Gas Fuel Oil #6
$ kWh $ MMBtu $ MMBtu
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$7,784
Cost:
$12,000
$7,784 341,442 - - - - $7,784
341,442
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$23,650
Cost:
-
$23,650 1,037,515 - - - - $23,650
1,037,515
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,509
Cost:
$8,996
$10,509 268,757 - - - - $10,509
268,757
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$10,820
Cost:
$9,000
$10,820 - - - - - $10,820
-
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$21,395
Cost:
$132,168
$21,395 547,186 - - - - $21,395
547,186
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,573
Cost:
$500
- - $2,921 835 $652 122 -
-
kWh
$2,921
835
MMBtu
$652
122
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$982
Cost:
$565
- - $803 229 $179 34 -
-
kWh
$803
229
MMBtu
$179
34
MMBtu
TOTAL RECOMMENDED Savings:
$78,713
Cost:
$163,229
$74,158 2,194,900 $3,724 1,064 $831 156 $74,158
2,194,900
kWh
$3,724
1,064
MMBtu
$831
156
MMBtu
TOTAL IMPLEMENTED Savings:
$57,384
Cost:
$145,233
$52,829 1,926,143 $3,724 1,064 $831 156 $52,829
1,926,143
kWh
$3,724
1,064
MMBtu
$831
156
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #6 Electricity Usage Natural Gas Fuel Oil #6