IAC logo
IAC Assessment: GT0177
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0177
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1983
Principal Product TUFTED CARPET
NAICS n/a
SIC 2273 - Carpets And Rugs
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 0
Annual Production 225,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $477,526 13,204,279 kWh $0.04
Natural Gas $1,583,726 360,864 MMBtu $4.39
Fuel Oil #6 $52,287 13,153 MMBtu $3.98
TOTAL ENERGY COSTS $2,113,539
RECOMMENDED SAVINGS* $449,340 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$48,100
Cost:
$500
- - $48,100 11,300 -
-
kWh
$48,100
11,300
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$31,900
Cost:
$35,000
- - $31,900 7,600 -
-
kWh
$31,900
7,600
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,450
Cost:
$800
- - $2,450 583 -
-
kWh
$2,450
583
MMBtu
04: 2.5191 MODIFY DYE BECK Savings:
$100,000
Cost:
-
- - $100,000 24,000 -
-
kWh
$100,000
24,000
MMBtu
05: 2.5191 MODIFY DYE BECK Savings:
$190,000
Cost:
$213,000
- - $190,000 46,000 -
-
kWh
$190,000
46,000
MMBtu
06: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$13,000
Cost:
$20,000
- - $13,000 3,000 -
-
kWh
$13,000
3,000
MMBtu
07: 2.5192 MODIFY TEXTILE DRYERS Savings:
$36,800
Cost:
$25,000
- - $36,800 7,290 -
-
kWh
$36,800
7,290
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,890
Cost:
$14,342
$8,890 245,604 - - $8,890
245,604
kWh
-
-
MMBtu
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$18,200
Cost:
$89,800
$18,200 504,103 - - $18,200
504,103
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$449,340
Cost:
$398,442
$27,090 749,707 $422,250 99,773 $27,090
749,707
kWh
$422,250
99,773
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas