IAC logo
IAC Assessment: GT0189
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0189
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1983
Principal Product VIDEO CASSETTE TAPES
NAICS n/a
SIC 3652 - Prerecorded Records And Tapes
Sales $10,000,000-$50,000,000
# of Employees 290
Plant Area (Sq.Ft.) 0
Annual Production 25,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $536,654 13,179,660 kWh $0.04
Natural Gas $26,400 5,860 MMBtu $4.51
TOTAL ENERGY COSTS $563,054
RECOMMENDED SAVINGS* $86,297 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,754
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$20,520
Cost:
$57,400
$20,520 504,103 $20,520
504,103
kWh
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,754
Cost:
$1,000
$1,754 43,083 $1,754
43,083
kWh
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,560
Cost:
$8,000
$4,560 111,372 $4,560
111,372
kWh
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$9,900
Cost:
$9,000
$9,900 - $9,900
-
kWh
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,583
Cost:
$1,660
$1,583 38,980 $1,583
38,980
kWh
06: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF Savings:
$10,380
Cost:
$25,200
$10,380 127,784 $10,380
127,784
kWh
07: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$37,600
Cost:
$20,000
$37,600 1,740,914 $37,600
1,740,914
kWh
TOTAL RECOMMENDED Savings:
$86,297
Cost:
$122,260
$86,297 2,566,236 $86,297
2,566,236
kWh
TOTAL IMPLEMENTED Savings:
$1,754
Cost:
$1,000
$1,754 43,083 $1,754
43,083
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage