Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1983
Principal Product BEEF
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $50,000,000-$100,000,000
# of Employees 208
Plant Area (Sq.Ft.) 0
Annual Production 50,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $344,117 7,684,936 kWh $0.04
Natural Gas $166,585 31,632 MMBtu $5.27
TOTAL ENERGY COSTS $510,702
RECOMMENDED SAVINGS* $36,150 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,310
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,089
Cost:
$250
- - $2,089 410 -
-
kWh
$2,089
410
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,957
Cost:
$4,500
$3,957 90,856 - - $3,957
90,856
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,914
Cost:
$37,000
$5,914 135,991 - - $5,914
135,991
kWh
-
-
MMBtu
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$7,310
Cost:
$9,000
$7,310 - - - $7,310
-
kWh
-
-
MMBtu
05: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$8,380
Cost:
$12,500
- - $8,380 1,640 -
-
kWh
$8,380
1,640
MMBtu
06: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$8,500
Cost:
$14,000
$8,500 195,193 - - $8,500
195,193
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$36,150
Cost:
$77,250
$25,681 422,040 $10,469 2,050 $25,681
422,040
kWh
$10,469
2,050
MMBtu
TOTAL IMPLEMENTED Savings:
$7,310
Cost:
$9,000
$7,310 - - - $7,310
-
kWh
-
-
MMBtu
Savings