IAC Assessment: GT0204
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1983
Principal Product BLEACHING GREY GOODS
NAICS n/a
SIC 2261 - Finishing Plants, Cotton
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 0
Annual Production 17,500,000 Pounds
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $412,383 8,048,945 kWh $0.05
Natural Gas $548,490 104,013 MMBtu $5.27
Fuel Oil #6 $106,202 23,256 MMBtu $4.57
TOTAL ENERGY COSTS $1,067,075
RECOMMENDED SAVINGS* $184,568 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #6 Electricity Usage Natural Gas Fuel Oil #6
$ kWh $ MMBtu $ MMBtu
01: 2.5192 MODIFY TEXTILE DRYERS Savings:
$74,410
Cost:
$50,000
- - $71,248 13,552 $3,162 788 -
-
kWh
$71,248
13,552
MMBtu
$3,162
788
MMBtu
02: 2.5192 MODIFY TEXTILE DRYERS Savings:
$67,354
Cost:
$50,000
- - $60,825 11,243 $6,529 1,207 -
-
kWh
$60,825
11,243
MMBtu
$6,529
1,207
MMBtu
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$8,427
Cost:
$700
- - $6,611 1,317 $1,816 393 -
-
kWh
$6,611
1,317
MMBtu
$1,816
393
MMBtu
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$6,370
Cost:
$5,000
$6,370 - - - - - $6,370
-
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$19,377
Cost:
$18,463
$19,377 378,664 - - - - $19,377
378,664
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,630
Cost:
$5,999
- - $6,645 1,353 $1,985 398 -
-
kWh
$6,645
1,353
MMBtu
$1,985
398
MMBtu
TOTAL RECOMMENDED Savings:
$184,568
Cost:
$130,162
$25,747 378,664 $145,329 27,465 $13,492 2,786 $25,747
378,664
kWh
$145,329
27,465
MMBtu
$13,492
2,786
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #6 Electricity Usage Natural Gas Fuel Oil #6