IAC Assessment: GT0293
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0293
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1986
Principal Product CARPET
NAICS n/a
SIC 2273 - Carpets And Rugs
Sales $10,000,000-$50,000,000
# of Employees 495
Plant Area (Sq.Ft.) 0
Annual Production 81,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $799,702 14,713,072 kWh $0.05
Natural Gas $1,115 201 MMBtu $5.55
Coal $620,362 342,857 MMBtu $1.81
TOTAL ENERGY COSTS $1,421,179
RECOMMENDED SAVINGS* $103,579 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $70,363
#|Description Savings
Cost
Status Electricity Usage Coal Electricity Usage Coal
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,733
Cost:
$2,969
$1,733 32,825 - - $1,733
32,825
kWh
-
-
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$65,300
Cost:
$75,000
- - $65,300 33,213 -
-
kWh
$65,300
33,213
MMBtu
03: 2.5192 MODIFY TEXTILE DRYERS Savings:
$15,800
Cost:
$10,000
- - $15,800 6,214 -
-
kWh
$15,800
6,214
MMBtu
04: 2.5194 REDESIGN PROCESS Savings:
$11,566
Cost:
-
$11,566 470,399 - - $11,566
470,399
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,360
Cost:
$10,588
$3,360 63,599 - - $3,360
63,599
kWh
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,330
Cost:
$3,045
- - $3,330 1,306 -
-
kWh
$3,330
1,306
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,490
Cost:
-
$2,490 46,893 - - $2,490
46,893
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$103,579
Cost:
$101,602
$19,149 613,716 $84,430 40,733 $19,149
613,716
kWh
$84,430
40,733
MMBtu
TOTAL IMPLEMENTED Savings:
$70,363
Cost:
$81,014
$1,733 32,825 $68,630 34,519 $1,733
32,825
kWh
$68,630
34,519
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Coal Electricity Usage Coal