Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 1986 |
Principal Product | AUOTOMOTIVE COMPONENTS |
NAICS | n/a |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $10,000,000-$50,000,000 |
# of Employees | 490 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 1,380,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $826,534 | 18,609,027 | kWh | $0.04 |
Natural Gas | $527,865 | 99,217 | MMBtu | $5.32 |
TOTAL ENERGY COSTS | $1,354,399 | |||
RECOMMENDED SAVINGS* | $117,146 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $117,146 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,616 Cost: $1,866 |
$1,616 | 36,635 | - | - | - | - | - | - |
$1,616 36,635 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,278 Cost: $218 |
$5,278 | 118,699 | - | - | - | - | - | - |
$5,278 118,699 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $4,183 Cost: $300 |
- | - | - | - | $5,183 | 1,941 | $(-1,000) | - |
- - kWh |
- - MMBtu |
$5,183 1,941 MMBtu |
$(-1,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1333 CONVERT COMBUSTION EQUIPMENT TO BURN OIL |
Savings: $56,269 Cost: - |
- | - | $159,375 | 37,500 | $(-103,106) | (-38,617) | - | - |
- - kWh |
$159,375 37,500 MMBtu |
$(-103,106) (-38,617) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2212 USE MINIMUM SAFE OVEN VENTILATION |
Savings: $46,250 Cost: $10,000 |
- | - | $46,250 | 10,886 | - | - | - | - |
- - kWh |
$46,250 10,886 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $3,550 Cost: $8,000 |
- | - | - | - | $3,550 | 1,330 | - | - |
- - kWh |
- - MMBtu |
$3,550 1,330 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $117,146 Cost: $20,384 |
$6,894 | 155,334 | $205,625 | 48,386 | $(-94,373) | (-35,346) | $(-1,000) | - | $6,894 155,334 kWh |
$205,625 48,386 MMBtu |
$(-94,373) (-35,346) MMBtu |
$(-1,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $117,146 Cost: $20,384 |
$6,894 | 155,334 | $205,625 | 48,386 | $(-94,373) | (-35,346) | $(-1,000) | - | $6,894 155,334 kWh |
$205,625 48,386 MMBtu |
$(-94,373) (-35,346) MMBtu |
$(-1,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes |