Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1986
Principal Product CARPET YARN
NAICS n/a
SIC 2281 - Yarn Spinning Mills
Sales $10,000,000-$50,000,000
# of Employees 312
Plant Area (Sq.Ft.) 0
Annual Production 14,300,000 Pounds
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $599,630 12,281,067 kWh $0.05
Natural Gas $207,496 50,487 MMBtu $4.11
Fuel Oil #2 $11,001 1,793 MMBtu $6.14
TOTAL ENERGY COSTS $818,127
RECOMMENDED SAVINGS* $272,735 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $225,497
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,038
Cost:
$4,850
$4,038 82,649 - - - - $4,038
82,649
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,160
Cost:
$23,760
$12,160 247,948 - - - - $12,160
247,948
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,670
Cost:
$4,860
$2,670 54,513 - - - - $2,670
54,513
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.2711 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING Savings:
$35,600
Cost:
-
$35,600 725,967 - - - - $35,600
725,967
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS Savings:
$196,997
Cost:
-
- - $190,847 52,002 $6,150 1,793 -
-
kWh
$190,847
52,002
MMBtu
$6,150
1,793
MMBtu
06: 2.1111 CONTROL PRESSURE ON STEAMER OPERATIONS Savings:
$7,600
Cost:
$2,280
- - $7,600 2,177 - - -
-
kWh
$7,600
2,177
MMBtu
-
-
MMBtu
07: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$13,670
Cost:
-
$13,670 279,015 - - - - $13,670
279,015
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$272,735
Cost:
$35,750
$68,138 1,390,092 $198,447 54,179 $6,150 1,793 $68,138
1,390,092
kWh
$198,447
54,179
MMBtu
$6,150
1,793
MMBtu
TOTAL IMPLEMENTED Savings:
$225,497
Cost:
$28,620
$28,500 581,476 $190,847 52,002 $6,150 1,793 $28,500
581,476
kWh
$190,847
52,002
MMBtu
$6,150
1,793
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2