IAC logo
IAC Assessment: GT0319
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0319
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1987
Principal Product MARGARINE
NAICS n/a
SIC 2079 - Edible Fats And Oils, Nec
Sales $50,000,000-$100,000,000
# of Employees 225
Plant Area (Sq.Ft.) 0
Annual Production 161,000 Pounds
Production Hrs. Annual 4,800
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $406,931 5,815,944 kWh $0.07
Natural Gas $94,573 19,485 MMBtu $4.85
TOTAL ENERGY COSTS $501,504
RECOMMENDED SAVINGS* $56,843 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,480
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,910
Cost:
$300
- - $2,910 619 - - -
-
kWh
$2,910
619
MMBtu
-
-
$
02: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$850
Cost:
-
- - $850 180 - - -
-
kWh
$850
180
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,990
Cost:
$2,430
$1,990 28,722 - - - - $1,990
28,722
kWh
-
-
MMBtu
-
-
$
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$8,110
Cost:
$4,400
- - $4,610 984 $3,500 - -
-
kWh
$4,610
984
MMBtu
$3,500
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$13,200
Cost:
$12,400
$13,200 189,039 - - - - $13,200
189,039
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,500
Cost:
$39,600
$19,500 276,084 - - - - $19,500
276,084
kWh
-
-
MMBtu
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,483
Cost:
$3,725
$2,483 35,463 - - - - $2,483
35,463
kWh
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,770
Cost:
$8,290
$2,770 39,566 - - - - $2,770
39,566
kWh
-
-
MMBtu
-
-
$
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,030
Cost:
$15,000
- - $5,030 1,070 - - -
-
kWh
$5,030
1,070
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$56,843
Cost:
$86,145
$39,943 568,874 $13,400 2,853 $3,500 - $39,943
568,874
kWh
$13,400
2,853
MMBtu
$3,500
-
$
TOTAL IMPLEMENTED Savings:
$48,480
Cost:
$67,420
$37,460 533,411 $7,520 1,603 $3,500 - $37,460
533,411
kWh
$7,520
1,603
MMBtu
$3,500
-
$
Savings
Cost
$ kWh $ MMBtu $ $