IAC Assessment: GT0431
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0431
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1991
Principal Product GRADUATION CAPS & GOWNS
NAICS n/a
SIC 2389 - Apparel And Accessories, Nec
Sales $10,000,000-$50,000,000
# of Employees 218
Plant Area (Sq.Ft.) 0
Annual Production 1,400,000 Pieces
Production Hrs. Annual 4,500
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $163,372 2,597,890 kWh $0.06
Natural Gas $4,045 1,753 MMBtu $2.31
TOTAL ENERGY COSTS $167,417
RECOMMENDED SAVINGS* $29,108 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,108
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,660
Cost:
$2,037
$23,660 376,319 - - $23,660
376,319
kWh
-
-
MMBtu
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,390
Cost:
$1,365
$1,390 21,981 - - $1,390
21,981
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$530
Cost:
$1,840
$530 8,499 - - $530
8,499
kWh
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,609
Cost:
$9,880
$2,609 41,325 - - $2,609
41,325
kWh
-
-
MMBtu
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$696
Cost:
$200
- - $696 313 -
-
kWh
$696
313
MMBtu
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$223
Cost:
$400
- - $223 100 -
-
kWh
$223
100
MMBtu
TOTAL RECOMMENDED Savings:
$29,108
Cost:
$15,722
$28,189 448,124 $919 413 $28,189
448,124
kWh
$919
413
MMBtu
TOTAL IMPLEMENTED Savings:
$29,108
Cost:
$15,722
$28,189 448,124 $919 413 $28,189
448,124
kWh
$919
413
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas