IAC logo
IAC Assessment: GT0436
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0436
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1991
Principal Product BUILDING MARBLE
NAICS n/a
SIC 3281 - Cut Stone And Stone Products
Sales $5,000,000-$10,000,000
# of Employees 72
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,040
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $220,399 2,584,115 kWh $0.09
Natural Gas $49,838 8,435 MMBtu $5.91
TOTAL ENERGY COSTS $270,237
RECOMMENDED SAVINGS* $52,772 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$43,650
Cost:
-
$43,650 - - - - - $43,650
-
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$44
Cost:
-
$140 2,052 - - $(-96) - $140
2,052
kWh
-
-
MMBtu
$(-96)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,488
Cost:
$5,487
$1,488 21,688 - - - - $1,488
21,688
kWh
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$387
Cost:
$4,645
$387 2,931 - - - - $387
2,931
kWh
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,085
Cost:
-
$1,085 15,826 - - - - $1,085
15,826
kWh
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$260
Cost:
$300
$260 3,810 - - - - $260
3,810
kWh
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,970
Cost:
$2,400
$3,970 57,737 - - - - $3,970
57,737
kWh
-
-
MMBtu
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,238
Cost:
-
- - $738 127 $500 - -
-
kWh
$738
127
MMBtu
$500
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$310
Cost:
$119
- - $310 52 - - -
-
kWh
$310
52
MMBtu
-
-
$
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$340
Cost:
$100
- - $340 59 - - -
-
kWh
$340
59
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$52,772
Cost:
$13,051
$50,980 104,044 $1,388 238 $404 - $50,980
104,044
kWh
$1,388
238
MMBtu
$404
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes