IAC Assessment: GT0441
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0441
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1991
Principal Product CORRUGATED PACKAGING
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $50,000,000-$100,000,000
# of Employees 190
Plant Area (Sq.Ft.) 0
Annual Production 85,800 Tons
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $467,294 8,508,206 kWh $0.05
Natural Gas $54,422 11,078 MMBtu $4.91
LPG $30,135 3,815 MMBtu $7.90
Other Energy $5,429 8,088 MMBtu $0.67
TOTAL ENERGY COSTS $557,280
RECOMMENDED SAVINGS* $41,369 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,369
#|Description Savings
Cost
Status Electricity Usage Other Energy Administrative Changes Electricity Usage Other Energy Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,647
Cost:
$11,262
$2,647 48,359 - - - - $2,647
48,359
kWh
-
-
MMBtu
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,300
Cost:
-
$4,300 140,973 - - - - $4,300
140,973
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,427
Cost:
-
$4,710 85,873 - - $(-283) - $4,710
85,873
kWh
-
-
MMBtu
$(-283)
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$215
Cost:
$75
$215 3,810 - - - - $215
3,810
kWh
-
-
MMBtu
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$13,000
Cost:
$15,000
$13,000 - - - - - $13,000
-
kWh
-
-
MMBtu
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$16,780
Cost:
-
$16,900 307,737 $(-120) (-1,750) - - $16,900
307,737
kWh
$(-120)
(-1,750)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$41,369
Cost:
$26,337
$41,772 586,752 $(-120) (-1,750) $(-283) - $41,772
586,752
kWh
$(-120)
(-1,750)
MMBtu
$(-283)
-
$
TOTAL IMPLEMENTED Savings:
$41,369
Cost:
$26,337
$41,772 586,752 $(-120) (-1,750) $(-283) - $41,772
586,752
kWh
$(-120)
(-1,750)
MMBtu
$(-283)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Other Energy Administrative Changes Electricity Usage Other Energy Administrative Changes