IAC logo
IAC Assessment: GT0442
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0442
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1991
Principal Product CORRUGATED CARDBOARD
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 714,000 Thousand Feet
Production Hrs. Annual 6,120
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $261,878 3,924,092 kWh $0.07
Natural Gas $166,977 55,659 MMBtu $3.00
TOTAL ENERGY COSTS $428,855
RECOMMENDED SAVINGS* $19,219 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,000
Cost:
$12,800
$5,000 87,925 - - - - $5,000
87,925
kWh
-
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$440
Cost:
$180
$440 6,448 - - - - $440
6,448
kWh
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,430
Cost:
-
- - $2,880 960 $(-450) - -
-
kWh
$2,880
960
MMBtu
$(-450)
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$813
Cost:
$497
$813 12,309 - - - - $813
12,309
kWh
-
-
MMBtu
-
-
$
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$5,310
Cost:
$3,750
- - $5,310 1,770 - - -
-
kWh
$5,310
1,770
MMBtu
-
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,650
Cost:
-
$1,650 24,912 - - - - $1,650
24,912
kWh
-
-
MMBtu
-
-
$
07: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$3,576
Cost:
$2,350
$3,064 46,014 $512 171 - - $3,064
46,014
kWh
$512
171
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$19,219
Cost:
$19,577
$10,967 177,608 $8,702 2,901 $(-450) - $10,967
177,608
kWh
$8,702
2,901
MMBtu
$(-450)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes