IAC logo
IAC Assessment: GT0459
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0459
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1992
Principal Product MULTI WIRE CIRCUIT BOARD
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 20,000 Pieces
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $271,739 4,853,458 kWh $0.06
Natural Gas $158,516 30,218 MMBtu $5.25
TOTAL ENERGY COSTS $430,255
RECOMMENDED SAVINGS* $98,773 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$60,620
Cost:
$26,000
- - $60,620 - - - -
-
kWh
$60,620
-
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,539
Cost:
$300
- - $1,539 466 - - -
-
kWh
$1,539
466
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,845
Cost:
$10,500
- - $7,845 2,377 - - -
-
kWh
$7,845
2,377
MMBtu
-
-
$
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,200
Cost:
$400
- - $2,200 670 - - -
-
kWh
$2,200
670
MMBtu
-
-
$
05: 2.2123 INSULATE FEEDWATER TANK Savings:
$200
Cost:
$440
- - $200 59 - - -
-
kWh
$200
59
MMBtu
-
-
$
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$11,065
Cost:
$12,750
$11,065 - - - - - $11,065
-
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,417
Cost:
$2,080
$1,747 32,239 - - $(-330) - $1,747
32,239
kWh
-
-
MMBtu
$(-330)
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,321
Cost:
$17,890
$4,321 80,012 - - - - $4,321
80,012
kWh
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$249
Cost:
$340
$249 4,689 - - - - $249
4,689
kWh
-
-
MMBtu
-
-
$
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$9,317
Cost:
$2,400
$9,317 377,198 - - - - $9,317
377,198
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$98,773
Cost:
$73,100
$26,699 494,138 $72,404 3,572 $(-330) - $26,699
494,138
kWh
$72,404
3,572
MMBtu
$(-330)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes