IAC logo
IAC Assessment: GT0479
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0479
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1992
Principal Product LATEX GLOVES
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 860,000,000 Pieces
Production Hrs. Annual 8,616
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $358,987 7,886,870 kWh $0.05
Natural Gas $801,680 228,077 MMBtu $3.51
TOTAL ENERGY COSTS $1,160,667
RECOMMENDED SAVINGS* $137,914 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,282
Cost:
$18,910
$5,801 127,491 - - $(-519) - $5,801
127,491
kWh
-
-
MMBtu
$(-519)
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,180
Cost:
$1,480
$2,180 48,066 - - - - $2,180
48,066
kWh
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$16,146
Cost:
$20,488
- - $16,146 4,600 - - -
-
kWh
$16,146
4,600
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,378
Cost:
$28,850
$1,378 30,188 - - - - $1,378
30,188
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,086
Cost:
$450
$6,086 133,646 - - - - $6,086
133,646
kWh
-
-
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$17,000
Cost:
$450
- - $17,450 4,970 $(-450) - -
-
kWh
$17,450
4,970
MMBtu
$(-450)
-
$
07: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$1,392
Cost:
$1,250
- - $1,392 397 - - -
-
kWh
$1,392
397
MMBtu
-
-
$
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$88,450
Cost:
$133,000
- - $88,450 25,200 - - -
-
kWh
$88,450
25,200
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$137,914
Cost:
$204,878
$15,445 339,391 $123,438 35,167 $(-969) - $15,445
339,391
kWh
$123,438
35,167
MMBtu
$(-969)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes