IAC Assessment: GT0506
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0506
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1993
Principal Product Commercial Ice Machines
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $50,000,000-$100,000,000
# of Employees 210
Plant Area (Sq.Ft.) 0
Annual Production 40,000 Pieces
Production Hrs. Annual 1,968
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $329,607 3,924,092 kWh $0.08
Natural Gas $47,657 8,392 MMBtu $5.68
TOTAL ENERGY COSTS $377,264
RECOMMENDED SAVINGS* $35,310 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,380
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,080
Cost:
$4,175
$1,080 12,896 $1,080
12,896
kWh
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$300
Cost:
$200
$300 3,517 $300
3,517
kWh
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,210
Cost:
$640
$1,210 14,361 $1,210
14,361
kWh
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,180
Cost:
$4,000
$1,180 14,068 $1,180
14,068
kWh
05: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$9,230
Cost:
$11,000
$9,230 476,260 $9,230
476,260
kWh
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,470
Cost:
$2,480
$1,470 67,702 $1,470
67,702
kWh
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$18,870
Cost:
$34,800
$18,870 132,474 $18,870
132,474
kWh
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$520
Cost:
$3,310
$520 6,155 $520
6,155
kWh
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$230
Cost:
-
$230 2,638 $230
2,638
kWh
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,220
Cost:
$500
$1,220 14,654 $1,220
14,654
kWh
TOTAL RECOMMENDED Savings:
$35,310
Cost:
$61,105
$35,310 744,725 $35,310
744,725
kWh
TOTAL IMPLEMENTED Savings:
$24,380
Cost:
$42,795
$24,380 248,242 $24,380
248,242
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage