IAC Assessment: GT0557
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0557
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1995
Principal Product Lead-Acid Batteries
NAICS n/a
SIC 3692 - Primary Batteries, Dry And Wet
Sales $10,000,000-$50,000,000
# of Employees 118
Plant Area (Sq.Ft.) 108,000
Annual Production 743,000 Pieces
Production Hrs. Annual 6,240
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $364,846 8,739,156 kWh $0.04
Natural Gas $106,416 18,218 MMBtu $5.84
TOTAL ENERGY COSTS $475,292
RECOMMENDED SAVINGS* $39,940 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,420
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (haz) Electricity Usage Natural Gas Solid Waste (haz)
$ kWh $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,590
Cost:
$23,400
$2,590 107,855 - - - - $2,590
107,855
kWh
-
-
MMBtu
-
-
lb
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$910
Cost:
-
$910 37,808 - - - - $910
37,808
kWh
-
-
MMBtu
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,320
Cost:
$58,400
$2,320 96,717 - - - - $2,320
96,717
kWh
-
-
MMBtu
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,600
Cost:
$2,270
$2,600 109,320 - - - - $2,600
109,320
kWh
-
-
MMBtu
-
-
lb
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,120
Cost:
$13,340
- - $13,120 2,059 - - -
-
kWh
$13,120
2,059
MMBtu
-
-
lb
06: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$4,100
Cost:
$240
- - $4,100 640 - - -
-
kWh
$4,100
640
MMBtu
-
-
lb
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$14,300
Cost:
-
- - - - $14,300 2,720 -
-
kWh
-
-
MMBtu
$14,300
2,720
lb
TOTAL RECOMMENDED Savings:
$39,940
Cost:
$97,650
$8,420 351,700 $17,220 2,699 $14,300 2,720 $8,420
351,700
kWh
$17,220
2,699
MMBtu
$14,300
2,720
lb
TOTAL IMPLEMENTED Savings:
$8,420
Cost:
$84,070
$8,420 351,700 - - - - $8,420
351,700
kWh
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (haz) Electricity Usage Natural Gas Solid Waste (haz)