IAC logo
IAC Assessment: GT0558
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0558
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1995
Principal Product FLour Mixes
NAICS n/a
SIC 2041 - Flour And Other Grain Mill Products
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 130,000
Annual Production 200,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $569,847 10,453,107 kWh $0.05
Natural Gas $28,182 4,816 MMBtu $5.85
TOTAL ENERGY COSTS $598,029
RECOMMENDED SAVINGS* $66,980 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$12,690
Cost:
$20,000
- - - - $12,690 - -
-
kWh
-
-
MMBtu
$12,690
-
$
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$28,400
Cost:
-
$28,400 - - - - - $28,400
-
kWh
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$12,210
Cost:
$88,380
$12,210 230,070 - - - - $12,210
230,070
kWh
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,250
Cost:
$1,720
$2,250 44,549 - - - - $2,250
44,549
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,030
Cost:
$9,070
$3,030 37,808 - - - - $3,030
37,808
kWh
-
-
MMBtu
-
-
$
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,000
Cost:
$240
$1,000 14,654 - - - - $1,000
14,654
kWh
-
-
MMBtu
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,040
Cost:
-
$1,040 20,809 - - - - $1,040
20,809
kWh
-
-
MMBtu
-
-
$
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$520
Cost:
$350
$520 10,258 - - - - $520
10,258
kWh
-
-
MMBtu
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,660
Cost:
-
$1,660 48,066 - - - - $1,660
48,066
kWh
-
-
MMBtu
-
-
$
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,180
Cost:
$2,500
- - $4,180 715 - - -
-
kWh
$4,180
715
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$66,980
Cost:
$122,260
$50,110 406,214 $4,180 715 $12,690 - $50,110
406,214
kWh
$4,180
715
MMBtu
$12,690
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes