IAC logo
IAC Assessment: GT0580
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0580
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1996
Principal Product Pressure Sensitive Labels
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 31,800
Annual Production 833 Thousand Feet
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,418 746,190 kWh $0.03
Electricity Demand $36,671 2,389 kW-months/year $15.35
Electricity Fees $422 - $ -
Natural Gas $4,646 833 MMBtu $5.58
TOTAL ENERGY COSTS $64,157
RECOMMENDED SAVINGS* $14,240 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,010
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,982
Cost:
-
- - $1,982 204 - - -
-
kWh
$1,982
204
kW-months/year
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$138
Cost:
$1,240
$44 1,758 $94 6 - - $44
1,758
kWh
$94
6
kW-months/year
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,110
Cost:
$13,490
$2,162 85,580 $2,948 202 - - $2,162
85,580
kWh
$2,948
202
kW-months/year
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,630
Cost:
$400
$1,684 66,530 $1,946 132 - - $1,684
66,530
kWh
$1,946
132
kW-months/year
-
-
lb
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$220
Cost:
-
$100 4,103 $120 8 - - $100
4,103
kWh
$120
8
kW-months/year
-
-
lb
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,160
Cost:
$21,465
$(-80) (-3,224) $(-230) (-16) $3,470 788 $(-80)
(-3,224)
kWh
$(-230)
(-16)
kW-months/year
$3,470
788
lb
TOTAL RECOMMENDED Savings:
$14,240
Cost:
$36,595
$3,910 154,747 $6,860 536 $3,470 788 $3,910
154,747
kWh
$6,860
536
kW-months/year
$3,470
788
lb
TOTAL IMPLEMENTED Savings:
$7,010
Cost:
$21,865
$1,704 67,409 $1,836 124 $3,470 788 $1,704
67,409
kWh
$1,836
124
kW-months/year
$3,470
788
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)