IAC Assessment: GT0582
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0582
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1996
Principal Product Extruded Carpet Yarn
NAICS n/a
SIC 2273 - Carpets And Rugs
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 40,000
Annual Production 9,170,000 Pounds
Production Hrs. Annual 8,568
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $460,686 15,751,759 kWh $0.03
Electricity Fees $24,247 - $ -
Natural Gas $16,350 3,165 MMBtu $5.17
TOTAL ENERGY COSTS $446,983
RECOMMENDED SAVINGS* $267,300 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $174,670
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)
$ kWh $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,310
Cost:
$9,200
$3,310 107,855 - - $3,310
107,855
kWh
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,210
Cost:
$7,600
$1,210 39,566 - - $1,210
39,566
kWh
-
-
lb
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$14,000
Cost:
$36,900
$14,000 392,732 - - $14,000
392,732
kWh
-
-
lb
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,970
Cost:
-
$1,970 64,185 - - $1,970
64,185
kWh
-
-
lb
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,460
Cost:
$600
$6,460 210,434 - - $6,460
210,434
kWh
-
-
lb
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$80,700
Cost:
$14,000
$80,700 2,628,957 - - $80,700
2,628,957
kWh
-
-
lb
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$153,000
Cost:
$60,000
- - $153,000 167,344 -
-
kWh
$153,000
167,344
lb
08: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$6,650
Cost:
-
- - $6,650 72,676 -
-
kWh
$6,650
72,676
lb
TOTAL RECOMMENDED Savings:
$267,300
Cost:
$128,300
$107,650 3,443,729 $159,650 240,020 $107,650
3,443,729
kWh
$159,650
240,020
lb
TOTAL IMPLEMENTED Savings:
$174,670
Cost:
$105,100
$21,670 642,732 $153,000 167,344 $21,670
642,732
kWh
$153,000
167,344
lb
Savings
Cost
$ kWh $ lb
Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)