IAC Assessment: GT0701
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0701
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2000
Principal Product Carpet Coatings
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 99,000
Annual Production 58,500,000 Thousand Feet
Production Hrs. Annual 4,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,451 1,115,040 kWh $0.03
Electricity Demand $153,186 11,272 kW-months/year $13.59
Electricity Fees $11,198 - $ -
Natural Gas $31,853 5,146 MMBtu $6.19
TOTAL ENERGY COSTS $232,512
RECOMMENDED SAVINGS* $113,150 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,484
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$11,490
Cost:
$5,000
$5,036 167,850 $5,804 424 $650 - - - - - - - - - $5,036
167,850
kWh
$5,804
424
kW-months/year
$650
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$23,600
Cost:
$2,200
- - - - - - $23,600 3,816 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$23,600
3,816
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,842
Cost:
$9,456
$1,638 54,596 $2,105 155 $99 - - - - - - - - - $1,638
54,596
kWh
$2,105
155
kW-months/year
$99
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,420
Cost:
$25,117
$1,522 50,740 $1,821 134 $77 - - - - - - - - - $1,522
50,740
kWh
$1,821
134
kW-months/year
$77
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$2,219
Cost:
-
- - - - - - - - $2,219 62,333 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,219
62,333
lb
-
-
$
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$30,845
Cost:
-
- - - - - - - - - - - - $30,845 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$30,845
-
$
07: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$36,500
Cost:
$28,000
- - - - - - $6,500 1,022 - - $30,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,500
1,022
MMBtu
-
-
lb
$30,000
-
$
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,234
Cost:
$2,999
- - - - - - $1,234 206 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,234
206
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$113,150
Cost:
$72,772
$8,196 273,186 $9,730 713 $826 - $31,334 5,044 $2,219 62,333 $30,000 - $30,845 - $8,196
273,186
kWh
$9,730
713
kW-months/year
$826
-
$
$31,334
5,044
MMBtu
$2,219
62,333
lb
$30,000
-
$
$30,845
-
$
TOTAL IMPLEMENTED Savings:
$36,484
Cost:
$25,117
$1,522 50,740 $1,821 134 $77 - - - $2,219 62,333 - - $30,845 - $1,522
50,740
kWh
$1,821
134
kW-months/year
$77
-
$
-
-
MMBtu
$2,219
62,333
lb
-
-
$
$30,845
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes