Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2003
Principal Product COOKIES & CRACKERS
NAICS 311821 - Cookie and Cracker Manufacturing
SIC 2052 - Cookies And Crackers
Sales $10,000,000-$50,000,000
# of Employees 500
Plant Area (Sq.Ft.) 25,000,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $869,118 15,437,811 kWh $0.06
Natural Gas $494,410 120,925 MMBtu $4.09
TOTAL ENERGY COSTS $1,363,528
RECOMMENDED SAVINGS* $257,588 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $60,575
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Consumption Electricity Usage Natural Gas Water Consumption
$ kWh $ MMBtu $ Tgal
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,286
Cost:
$450
- - $5,286 1,402 - - -
-
kWh
$5,286
1,402
MMBtu
-
-
Tgal
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$31,370
Cost:
$5,000
- - $31,370 8,910 - - -
-
kWh
$31,370
8,910
MMBtu
-
-
Tgal
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,017
Cost:
-
$7,017 51,000 - - - - $7,017
51,000
kWh
-
-
MMBtu
-
-
Tgal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$697
Cost:
$50
$697 30,329 - - - - $697
30,329
kWh
-
-
MMBtu
-
-
Tgal
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$54,294
Cost:
$54,294
- - $30,700 7,515 $23,594 - -
-
kWh
$30,700
7,515
MMBtu
$23,594
-
Tgal
06: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$133,000
Cost:
$622,000
- - $133,000 35,250 - - -
-
kWh
$133,000
35,250
MMBtu
-
-
Tgal
07: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$4,433
Cost:
$111
$4,433 73,383 - - - - $4,433
73,383
kWh
-
-
MMBtu
-
-
Tgal
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,580
Cost:
$12,000
$2,580 41,100 - - - - $2,580
41,100
kWh
-
-
MMBtu
-
-
Tgal
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,221
Cost:
$11,587
$7,221 84,373 - - - - $7,221
84,373
kWh
-
-
MMBtu
-
-
Tgal
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,690
Cost:
$72,250
$11,690 236,707 - - - - $11,690
236,707
kWh
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$257,588
Cost:
$777,742
$33,638 516,892 $200,356 53,077 $23,594 - $33,638
516,892
kWh
$200,356
53,077
MMBtu
$23,594
-
Tgal
TOTAL IMPLEMENTED Savings:
$60,575
Cost:
$100,887
$29,205 443,509 $31,370 8,910 - - $29,205
443,509
kWh
$31,370
8,910
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Consumption Electricity Usage Natural Gas Water Consumption