IAC Assessment: GT0778
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0778
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2004
Principal Product Sausages, smoked meats
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 51
Plant Area (Sq.Ft.) 38,500
Annual Production 5,500 Tons
Production Hrs. Annual 2,340
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,520 2,160,437 kWh $0.05
Electricity Demand $32,973 5,400 kW-months/year $6.11
Natural Gas $76,482 9,550 MMBtu $8.01
TOTAL ENERGY COSTS $206,975
RECOMMENDED SAVINGS* $25,368 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,959
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.5111 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS Savings:
$6,613
Cost:
$33,628
- - - - $6,613 826 -
-
kWh
-
-
kW-months/year
$6,613
826
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,032
Cost:
$3,228
$452 16,268 $1,580 1,469 - - $452
16,268
kWh
$1,580
1,469
kW-months/year
-
-
MMBtu
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,134
Cost:
$100
$1,134 9,047 - - - - $1,134
9,047
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$927
Cost:
$600
$927 20,853 - - - - $927
20,853
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$719
Cost:
$600
$719 26,032 - - - - $719
26,032
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.1111 CONTROL PRESSURE ON STEAMER OPERATIONS Savings:
$5,788
Cost:
$13,000
- - - - $5,788 706 -
-
kWh
-
-
kW-months/year
$5,788
706
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,155
Cost:
$9,815
$3,673 140,682 $4,482 348 - - $3,673
140,682
kWh
$4,482
348
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$25,368
Cost:
$60,971
$6,905 212,882 $6,062 1,817 $12,401 1,532 $6,905
212,882
kWh
$6,062
1,817
kW-months/year
$12,401
1,532
MMBtu
TOTAL IMPLEMENTED Savings:
$2,959
Cost:
$3,828
$1,379 37,121 $1,580 1,469 - - $1,379
37,121
kWh
$1,580
1,469
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas