IAC Assessment: GT0846
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0846
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2008
Principal Product Carpet
NAICS 314110 - Carpet and Rug Mills
SIC 2273 - Carpets And Rugs
Sales $100,000,000-$500,000,000
# of Employees 365
Plant Area (Sq.Ft.) 348,000
Annual Production 234,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $694,446 17,606,200 kWh $0.04
Electricity Demand $167,530 39,888 kW-months/year $4.20
Natural Gas $2,989,254 364,830 MMBtu $8.19
Fuel Oil #6 $1,214,438 165,751 MMBtu $7.33
TOTAL ENERGY COSTS $5,065,668
RECOMMENDED SAVINGS* $905,525 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $317,187
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$61,777
Cost:
$40,000
- - - - $56,777 6,924 - - $5,000 - - - -
-
kWh
-
-
kW-months/year
$56,777
6,924
MMBtu
-
-
Tgal
$5,000
-
$
-
-
Tgal
02: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$16,146
Cost:
$15,536
- - - - $16,146 1,969 - - - - - - -
-
kWh
-
-
kW-months/year
$16,146
1,969
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$830
Cost:
$1,094
- - - - $830 101 - - - - - - -
-
kWh
-
-
kW-months/year
$830
101
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.2128 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) Savings:
$17,989
Cost:
$26,900
- - - - $11,915 1,453 $3,037 791 - - $3,037 - -
-
kWh
-
-
kW-months/year
$11,915
1,453
MMBtu
$3,037
791
Tgal
-
-
$
$3,037
-
Tgal
05: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$551,313
Cost:
$130,000
- - - - $537,583 65,559 - - - - $13,730 - -
-
kWh
-
-
kW-months/year
$537,583
65,559
MMBtu
-
-
Tgal
-
-
$
$13,730
-
Tgal
06: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$59,040
Cost:
$65,000
- - - - $59,040 7,200 - - - - - - -
-
kWh
-
-
kW-months/year
$59,040
7,200
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$155,720
Cost:
$30,000
$130,222 3,035,482 $25,498 6,071 - - - - - - - - $130,222
3,035,482
kWh
$25,498
6,071
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,504
Cost:
$70,103
$20,492 477,660 $4,012 955 - - - - - - - - $20,492
477,660
kWh
$4,012
955
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
09: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$18,206
Cost:
$35,000
$15,048 376,200 $3,158 752 - - - - - - - - $15,048
376,200
kWh
$3,158
752
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$905,525
Cost:
$413,633
$165,762 3,889,342 $32,668 7,778 $682,291 83,206 $3,037 791 $5,000 - $16,767 - $165,762
3,889,342
kWh
$32,668
7,778
kW-months/year
$682,291
83,206
MMBtu
$3,037
791
Tgal
$5,000
-
$
$16,767
-
Tgal
TOTAL IMPLEMENTED Savings:
$317,187
Cost:
$220,639
$150,714 3,513,142 $29,510 7,026 $131,963 16,093 - - $5,000 - - - $150,714
3,513,142
kWh
$29,510
7,026
kW-months/year
$131,963
16,093
MMBtu
-
-
Tgal
$5,000
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption